My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2003 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
COMPLIANCE INFO 2003 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 3:52:53 PM
Creation date
10/21/2019 3:25:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2008
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sunday, June 01, 2008 4:26 PM HMC- Henderson Maint Co (209) 465-4988 p.04 <br /> 99 LD-2000 Leak Detector <br /> In addition to the previously described submersible pump problems encountered without an in-line check <br /> valve, the r-rietering portion of the leak detector is hammered by hydraulic shock.This results in leaks going <br /> undetected. Those leak detectors are just not equipped for the job you purchased them for. <br /> The 99 1-D-2000 is the answer you have been looking for, leak detectors, with an integrated check <br /> valve dnd pressure relief valve, will save money, reduce customer frustration at the dispenser and reduce <br /> .service calls. <br /> Shortest Leak Detector Profile <br /> The 99 series leak detectors are the lowest profile leak detectors available today. <br /> Higher Level of Performance <br /> The 99 I_D-2000 has a higher levet of ,performance over a broader range of burial depth, line length, <br /> and piping system types than any other leak detector. <br /> Additional Features <br /> • Over 20% increased floe capacity <br /> • Guaranteed for 24 months from date of installation to detect 3 GPH @ 10 PSI leak <br /> Onc-Way Poppet flow path <br /> • Reverse Ratio Piston It Poppet combination <br /> • Smaller volume - faster response piston size <br /> • Shortest profile leak detector available for the "tight' installations <br /> • All fuels: gasoline. diesel alcohols, Biodiesel. Aviation: see Fuels Linder technical specifications. <br /> • All pipelines (flexible - fiberglass - steel) up to 400 nil. resiliency <br /> • Exceeds EPA regulations (3 GPH @ 10 PSI) <br /> • Detects leaks up to 10' above the leak detector <br /> • Installs with 2" six point socket or pipe wrench <br /> Increased Flog Capacity <br /> The 99 LD-2000 has maximized the flow and flow path in existing, older submersible pump heads, This new <br /> design allows over 20% more flow than previous LD-2000 models, maximizing pump performance for earlier <br /> pump housings. <br /> Longest Guarantee <br /> The 99 LD-2000 shares the longest guarantee available in the industry, along with Fill other 99 LD-2000 <br /> series leak detectors and the 99 LD-3000 series leak detectors. For 24 months from date of installation, the <br /> 99 LD-2000 is guaranteed to see a 3 GPH leak @ 10 PSI. <br /> Field adjustable Leak Threshold <br /> All mechanical line leak detectors h8ve been factory assembled and tested to meet the EPA leak detection <br /> threshold established during certification testing. Abnormal field conditions such as high line resiliency (high <br /> bleed-back). pump pressures over 30 PSI and high head pressures affect line leak detection sensitivity. <br /> Additionally. wear affects performance of leak detection over time. To meet these issues, established <br /> through certification testing, the ability of field technicians to adjust - mild s to compensate for field variables <br /> and normal wear. Please read Technical Bulletin 032805 for specific instructions on this feature, <br /> One-Way Poppet Flow Path <br /> The One-Way Poppet Flow Path isolates pump turbulence from line leak detection at pump start-up. l he <br /> hardened stainless steel poppet does not dimensionally change because of thermal conditions encountered <br /> during station operation (precision metering change is insignificant down to -20' P). <br />
The URL can be used to link to this page
Your browser does not support the video tag.