Laserfiche WebLink
, IVGrY uJI IIVJi/-1LLJ-Sli�JIV IIv..�+ +!..vt +wi4 + t`VV+ tu <br /> FAL-.LITS MAJ1E: ADOREss: <br /> SWEEPS! TANK! �/� — ; ULf / TANK MODEL/MA--IAL: <br /> CAPACITY: G G v PRODUCT: �.��c( 2C� R.E.H.S: <br /> A 1 <br /> P M ALL TANKS TO BE INSTALLED AND TESTED IM ACCORDANCE <br /> P I WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> R T /J�-e <br /> V A <br /> D S sI <br /> ITEM OR EQUIPMENT INSPECTED <br /> DATE <br /> 1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) (8) <br /> 2. UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br /> INITIAL INSPECTIONS <br /> 3. INSPECTION OANO TEST OF SECONDARY CONTAIM14EXT: HOLIDAY: <br /> VACUUM: SOAP: PSI: HRS/MIM: BRIME(LIOUID ANNULAR): OTHER: <br /> 4. PRIMARY TANK TEST: PSI: HRS/MIM: <br /> 5. TANK APPRCPRIATELT PLACED WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br /> PIPING INSPECTIONS <br /> 6. PRIMARY PIPING TEST (MIMI" 40 PSI/30 MIM) (CCR 2635 (B) (4)) <br /> 7. SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIM: OTHER: (CCR 2635 (A) (4)) <br /> 8. LAKE TEST ON ALL SUDS (24 HR. MIMI") MRS: (CCR 2635 (A)) <br /> 9. UNUSED TANK OPENINGS SEALED AMD CORROSION PROTECTED (CCR 2635) <br /> 10. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br /> 11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (B)) <br /> FINAL INSPECTION <br /> 12. PERFORMANCE TEST FOR •ALL• MONITORING PROBES (CCR 2632 (C) (2)) <br /> 13. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (A) (2)) <br /> 14. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2632 (D) 2635 (B) (5)) <br /> 15. PERFORKAMCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2635 (B) (5)) <br /> 16. BALL FLOAT VALVES INSTALLED (CCR 2635 (B) (6)) <br /> 17. OVERFILL PROTCTION INSTALLED/APPROVED (CCR 2635 (E) (2)) <br /> 18. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) (CCR 2631 (D) (5)) <br /> 19_ TANK INTEGRITY TEST (PASSING HARD COPT) (CCR 2635 (A) (5)) <br /> 20. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (E) (1) (2)) <br /> 21. 'Cu FORM COMPLETED AND SUBMITTED (CCR 2635 (E)) <br /> Z2. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2641-2644) <br /> Z3. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284 (E) (F)) <br /> COWENTS: <br /> EH23-006 3/92 <br />