My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
230
>
2300 - Underground Storage Tank Program
>
PR0540527
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2019 11:06:24 AM
Creation date
10/24/2019 10:48:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540527
PE
2381
FACILITY_ID
FA0023172
FACILITY_NAME
UNION OIL BULK PLANT #0366
STREET_NUMBER
230
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04321057
CURRENT_STATUS
02
SITE_LOCATION
230 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
标签
EHD - Public
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tRichard Fimmel • <br /> N.lerokee Lane Burger King <br /> 4.0 LrAITAnONS <br /> ' This report was prepared for the use of Borel Bank <br /> ' and Trust Company c/o Mr. Richard Fimmel, Esquire <br /> in evaluating soil and ground water quality at the <br /> t referenced site at the time of this study. we make no <br /> warranty, expressed or implied, except that our <br /> services have been performed in accordance with <br /> environmental principles generally accepted at this <br /> time and location. The chemical and other data <br /> ' presented in this report can change over time and are <br /> applicable only to the time this study was performed. <br /> ' we are not responsible for the data presented by <br /> others. <br /> ' The accuracy and reliability of geo- or hydrochemical <br /> studies are a reflection of the number and type of <br /> samples taken and extent of the analyses conducted, <br /> and are thus inherently limited and dependent upon <br /> ' the resources expended. Chemical analyses were <br /> performed for specific parameters during this <br /> ' investigation, as detailed in the scope of services. <br /> Please note that additional constituents not searched <br /> for during this investigation may be present in soil <br /> ' and ground water at the site. Our sampling and <br /> analytical plan was designed using accepted <br /> ' environmental engineering principles and our <br /> judgment for the performance of a reconnaissance <br /> ' soil and ground water quality investigation, and was <br /> based on the degree of investigation desired by you. <br /> ' It is possible to obtain a greater degree of certainty, if <br /> desired, by implementing a more rigorous soil and <br /> ground water sampling program or evaluating the risk <br /> ' posed by the contaminants detected, if any. <br /> ■ <br /> LOWNEYASSOCIATS <br /> ' Emnanm J/Gegernnol/Engn.m g SePage 5rvos <br />
The URL can be used to link to this page
Your browser does not support the video tag.