Laserfiche WebLink
SAN JOAQUIN COUNTY HAZARDOUS MATERIALS MANAGEMENT PLAN Page 2 of 3 <br /> orders, etc.) <br /> EVACUATION ASSEMBLY AREA(S) (9) RECEPTION OFFICE <br /> (Where employees are to report to) <br /> LOCATION OF HMMP FOR EMPLOYEE USEINSIDE SHOP DOOR TO OFFICE, NEXT TO MSDS BOOK & <br /> (10) EMPLOYEE POSTERS (WALL RACK) <br /> SURROUNDING OCCUPANCIES AND LAND USE SECTION (11) <br /> The following types of neighbors (e.g. residential, commercial, open space)are located within 1/8th mile of our fac <br /> Names of hospitals, schools, and day-care centers within 1/8th mile of our facility are also shown.This informatior <br /> should be provided to the 9-1-1 operator at the time of the initial notification. <br /> NORTH IDOL STORAGE & COMMERCIAL EAST COMMERCIAL SITES & INDUSTR <br /> SITES <br /> SOUTH OPEN SPACE WEST OPEN SPACE <br /> SPILL CONTROL PROCEDURES SECTION <br /> The following types of neighbors (e.g. residential, commercial, open space) are located within 1/811:1­ <br /> mile of our facility. Names of hospitals, schools, and day-care centers within 1/8th mile of our facilil <br /> are also shown. This information should be provided to the 9-1-1 operator at the time of the initial <br /> notification. <br /> SPILL CONTROL LEADER (12) MONTIE PAWLEY (PRESIDENT) <br /> (also oversees inspections of areas or <br /> systems vulnerable to earthquakes) <br /> HE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL(13) <br /> ANDREW F MILLER, JAMES KASINGER, CORY KASINGER, RANDY DAVENPORT, BRETT GARA <br /> AUTHORIZED SPILL CONTROL STRATEGIES (14) <br /> This business has authorized the above personnel to perform the action(s) indicated below to control spills of <br /> hazardous materials on its property. Persons performing these tasks will possess written procedures for performin <br /> hem and will have received training on the procedures and equipment needed prior to carrying them out. Locatior <br /> needed equipment are shown on the facility map. At a minimum our business must isolate the area of the spill and <br /> make notifications. <br /> PILLS OF LIQUID MATERIALS <br /> ❑ Plug and Patch Container ❑ Build Retention Dike <br /> 0 Remove Sources of Ignition Position Container so as to Stop Leak <br /> Reduce Pressure in container/System Isolate Area and Make Notifications <br /> ❑� Neutralize Spilled Material ❑ Secure System Valves and Closures <br /> ❑ Shutdown System Involved ❑ Apply Absorbent Material to Spill Area <br /> ❑ N/A <br /> RELEASE OF COMPRESSED GASES SPILLS OF SOLID MATERIALS <br /> ❑ Shut Off Valves/Systems ❑ Cover Spill to Prevent Spread <br /> ❑ Ventilate Area of Release ❑ Neutralize Spilled Materials <br /> ❑ Reduce Pressure in Container/System ❑ Position container so as to Stop Leak <br /> ❑ suppress vapors with Water ❑ Place Spilled Material Into Drum or Bag <br /> http://sjoesdata.org/oes_hnimp/section—tables/hmmp_ps review.lasso?-Database=transacti... 5/22/2009 <br />