My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
17100
>
2900 - Site Mitigation Program
>
PR0542311
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2019 10:36:54 AM
Creation date
10/29/2019 10:35:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542311
PE
2950
FACILITY_ID
FA0024298
FACILITY_NAME
CARPENTER COMPANY
STREET_NUMBER
17100
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19812004
CURRENT_STATUS
01
SITE_LOCATION
17100 S HARLAN RD
P_LOCATION
07
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sow `s <br /> Partner Site-Specific Health and Safety Plan <br /> Introduction <br /> Partner Engineering and Science, Inc. (Partner)has been retained by Vertical Ventures, LLC to conduct a Phase II <br /> Subsurface Investigation at the subject property. This Health and Safety Plan (HASP) document identifies the <br /> Health and Safety procedures that are intended to guide the field activities at the site. The details of this plan apply <br /> to employees of Partner and its subcontractors. Regulatory agencies are expected to observe the safety rules and <br /> regulations established by their respective organizations in addition to the requirements of this document. <br /> This plan must be reviewed and acknowledged by all personnel prior to entering the exclusion zone. In general,a <br /> "Tailgate Safety Meeting" is conducted at the initiation of on-site activities and at the beginning of each day <br /> thereafter until the completion of the project. However, the actual briefing may be conducted off-site (e.g., in the <br /> office) if conditions preclude or render impractical its completion on-site. <br /> This HASP will be a living document in that it will be continually updated and/or revised as the site conditions and <br /> knowledge of the operations develop further.The development and preparation of the HASP has been based on past <br /> experiences and site specific information at the time of preparation. If actual site conditions or operations vary from <br /> the data used to prepare this HASP,amendments shall be made to reflect those changes. <br /> This HASP has been developed with consideration to current safety standards, health effects, and standards for <br /> known contaminants and procedures designed to account for potential hazards from known and/or suspected <br /> substances. In preparing this document, Partner has specifically reviewed Occupational Safety & Health <br /> Administration(OSHA)Title 29 Code of Federal Regulations(CFR) 1910& 1926,California Occupational Safety <br /> &Health Administration(Cal/OSHA)Title 8 California Code of Regulations(CCR)5192,the National Institute of <br /> Occupational Safety & Health (NIOSH)/OSHA/United States Coast Guard (USCG)/Environmental Protection <br /> Agency (EPA) Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities, NIOSH <br /> Pocket Guide to Chemical Hazards, and the American Conference of Governmental Industrial Hygienists, Inc. <br /> (ACGIH)Threshold Limit Values for Chemical Substances and Chemical Agents. <br /> Project Information <br /> Project Type: Phase [I Subsurface Investigation <br /> Site Name: 17100 South Harlan Road <br /> Address: 17100 South Harlan Road <br /> Lathrop,California 95330 <br /> Partner Project Number: 17-192479.1 <br /> Project Scope of Work <br /> Advance six borings to 15 feet bgs and collect 24 soil samples and six groundwater samples for laboratory analysis. <br /> Utility Clearance <br /> Have necessary underground utility notifications for subsurface work been made?® Yes ❑Not Applicable <br /> Partner Site-Specific Health and Safety Plan Page 1 <br /> Version 1.02 October 16,2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.