Laserfiche WebLink
I`6 <br /> screen and solid caking, will be used. Vo. 3 Monterey Sand will ` <br /> be placed in the annulus space . IR <br /> Wells will beilogged and samples taken for analysis at each <br /> 5-foot interval . Water samples will be ,�taken after wells are <br /> developed. Soil samples will be sealedljin brass tubes and E <br /> refrigerated at 4"C for transport to laboratory. Water sample <br /> will be taken in 100-m1 bottles and refrigerated at 4° C for <br /> transport; Chain of Custody will be used. Wells will be pumped, <br /> using bladder typel umps . <br /> Excess water will be discharged to ', Storm sewer unless there <br /> is some indicationsof the presence of. hy'drocarbons or other <br /> hazardous material `s <br /> LABORATORY ANALYSIS <br /> Soil samples will be analyzed for Sodium, Potassium, E <br /> Chlorides, Sulfates, Total Dissolved Soiids, and pH. <br /> Water samplesiwill be taken from monitor wells MW-4, MW-5, <br /> MW-6, MW-7, and MW,,8 . Monitor wells No 'i 's 4 and 5 will be used <br /> as the reference wells . <br /> DISTRIBUTION OF DATA <br /> s � <br /> Test results �will be delivered to NIr. Stuart Somach at the <br /> Law Firm of McDonough, Holland & Allen . " Mr . Somach will <br /> determine whether further distribution of the test results is <br /> necessary . <br /> START DATE: Drilling will commence as soon as well permits are <br /> issued. <br /> TOPOGRAPHIC SURVEY1 <br /> A topographic. survey will be made to define the drab yr ' <br /> area around the plant . <br /> 199 <br /> RZ0 i <br /> P <br /> PErt� <br /> i <br /> 1 <br /> 3 <br /> 2 <br /> ti <br />