Laserfiche WebLink
-3- <br /> Community Development Department <br /> PA-1800259 (SA) <br /> a. A registered professional engineer shall design a system or combination of systems to <br /> infiltrate,treat,and/or filter the 85th percentile storm drainage as defined in the County's <br /> 2009"Storm Water Quality Control Criteria Plan"(SWQCCP)or in the"California <br /> Association of Stormwater Quality Agencies"(CASQA)publications and comply with the <br /> conditions of the County Phase II National Pollutant Discharge Elimination System <br /> (NPDES)permit. Standard"Best management Practices"for the type of development <br /> proposed shall be incorporated into the system design. CASQA documents are available at <br /> www.casga.om Plans and/or calculations of the proposed system shall be submitted to the <br /> County for review and approval. <br /> b. Applicant shall submit a"Storm Water Pollution Prevention Plan"(SWPPP)to Public Works <br /> for review. A SWPPP preparation guide is available at the Department of Public Works. A <br /> copy of the approved SWPPP and all required records,updates,test results and inspection reports <br /> shall be maintained on the construction site and be available for review upon request. The <br /> post construction chapter of the S WPPP must identify expected pollutants and how they will <br /> be prevented from entering the storm system. The chapter shall also contain a maintenance <br /> plan,a spill plan,and a training plan for all employees on proper use,handling and disposal <br /> of potential pollutants. The example plans are available in the SWQCCP and CASQA <br /> handbooks. <br /> c. Permit Registration Documents(PRD's) shall be filed with the State Water Resources <br /> Control Board(SWRCB)to comply with the State"General Permit for Storm Water <br /> Discharges Associated with Construction Activity".The Waste Discharge Identification <br /> (WDID)Number is issued by SWRCB shall be submitted to the Department of Public <br /> Works for the file. Contact SWRCB at(916)341-5537 for further information. Coverage <br /> under the SWRCB General Construction Permit Order 2009-0.009-DWQ shall be maintained <br /> throughout the duration of all phases of the project. <br /> d. Owner shall be responsible for providing the County with an annual report of operation and <br /> maintenance of any system.The property owner shall also be responsible for the payment <br /> to the County of an annual system inspection fee established by Resolution of the Board of <br /> Supervisors. <br /> e. A Maintenance Plan shall be submitted and the execution of a Maintenance Agreement <br /> with San Joaquin County shall be required for the owner/operator of stormwater controls <br /> prior to the release of the building permit. <br /> f. Standard Best Management Practices,for the type of development proposed,shall be <br /> incorporated into the site storm drainage design. <br /> g. Wastewater shall NOT be allowed into the storm drainage system. <br /> h. A State Central Valley Flood Protection Board's Encroachment Permit shall be obtained <br /> for work done on French Camp Slough's channel and within 30 feet from the top of its <br /> banks. <br />