Laserfiche WebLink
- 2 - <br /> Community Development Department <br /> PA- 1900061 ( UP ) <br /> Upon satisfaGtien of the above Fequ+FemeRts , the following Genditiens ef ApPFOYal shall apply. <br /> app " Gatiep- <br /> RECOMMENDATIONS . <br /> 1 . The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards . Retention basins shall be fenced with six (6 ) foot high chain link fence <br /> or equal when the maximum design depth is 18 inches or more . Required retention basin <br /> capacity shall be calculated and submitted along with a drainage plan for review and approval , <br /> prior to release of building permit . (Development Title Section 9 - 1135 ) <br /> 2 . A copy of the Final Site Plan shall be submitted prior to release of building permit . <br /> 3 . The Traffic Impact Mitigation Fee shall be required for this application . The fee is due and <br /> payable at the time of building permit application . The fee will be based on the current schedule <br /> at the time of payment . The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record . <br /> ( Resolutions R-00100433 ) <br /> 4 . The Regional Transportation Impact Fee shall be required for this application . The fee is due and <br /> payable at the time of building permit application . The fee will be based on the current schedule <br /> at the time of payment . ( Resolution R=06-38 ) <br /> 5 . The Water Supply Facilities Impact Mitigation Fee shall be required for this development . The <br /> fee is due and payable prior to issuance of the building permit . The fee will be based on the <br /> current schedule at the time of payment . ( Development Title Section 9 -818 .4 and Resolutions R- <br /> 91 = 327 , R- 94 - 185 and R-97 =5 <br /> 6 . This project falls within the definition of a Regulated Project as defined in either the County Post- <br /> Construction Standards Manual or the County Phase I National Pollutant Discharge Elimination <br /> System ( NPDES ) permit and shall comply with the following conditions : <br /> a . A registered professional engineer shall design a system or combination of systems to treat , <br /> filter or infiltrate the 85th percentile storm as defined in the County' s Post- Construction 2009 <br /> SWQCCP . The system design shall follow standards as outlined in the 2009 Storm Water <br /> Quality Control Criteria Plan and comply with the conditions of the County Phase I NPDES <br /> permit . Plans and /or calculations of the proposed system shall be submitted to the County for <br /> review and approval prior to clearance for plan check . <br /> b . All Priority New Development and Significant Redevelopment Projects must meet the <br /> volume reduction requirement outlined in the County ' s SWQCCP . <br /> c . Applicant shall submit a "Storm Water Pollution Prevention Plan " (SWPPP ) to Public Works <br /> for review . A SWPPP preparation guide is available at the Department of Public Works . A <br /> copy of the approved SWPPP and all required records , updates , test results and inspection <br /> reports shall be maintained on the construction site and be available for review upon <br /> request . The post construction chapter of the SWPPP must identify expected pollutants <br /> and how they will be prevented from entering the storm system . The chapter shall also <br />