My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012480
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CARDINAL
>
731
>
2600 - Land Use Program
>
PA-1900061
>
SU0012480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 2:53:11 PM
Creation date
11/5/2019 1:31:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012480
PE
2626
FACILITY_NAME
PA-1900061
STREET_NUMBER
731
Direction
S
STREET_NAME
CARDINAL
STREET_TYPE
AVE
City
STOCKTON
Zip
95215-
APN
15911024
ENTERED_DATE
8/6/2019 12:00:00 AM
SITE_LOCATION
731 S CARDINAL AVE
RECEIVED_DATE
8/26/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 � SJC0G=met , Inc . <br /> S J C O G, Inc . <br /> San Joagltin Coanty 1Vlalti-Species Habitat Conserv Dation Open Space Plan <br /> 555 East Weber Avenue • Stockton, CA 95202 • (209) 235 - 0600 • FAX (209 ) 235 -0438 <br /> SJMSCP HOLD <br /> TO : Local Jurisdiction : Community Development Department , Planning Department , Buildinq <br /> Department Engineering Department Survey Department , Transportation Department , <br /> Other : <br /> FROM : Laurel Boyd , SJCOG , Inc . <br /> il,l l► , I 1' 1 -4 (" q ,' IZE SIVE UISTURI3AN1'�1,'.'1 -7 <br /> � � " r a1 1 l� '� 1 �� nn �� �' , 1 . , 1, . 119 ' P JFC.'�J <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi . <br /> Species Habitat Conservation and Open Space Plan ( SJMSCP ) . In accordance with that agreement , the <br /> Applicant has agreed to : <br /> 1 ) SJMSCP Incidental Take Minimization Measures and mitigation requirement : <br /> 1 . Incidental Take Minimization Measures (ITMMs) will be issued to the project and must be signed by the <br /> project applicant prior to any ground disturbance but no later than six (6) months from receipt of the ITMMs . <br /> If ITMMs are not signed within six months, the applicant must reapply for SJMSCP Coverage . Upon receipt <br /> of signed ITMMs from project applicant, SJCOG , Inc . staff will sign the ITMMs . This is the effective date <br /> of the ITMMs . <br /> 2 . Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs . <br /> 3 . Upon issuance of fully executed ITMMs and prior to any ground disturbance , the project applicant must : <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered (the bond should be valid for no longer than a 6 month period) ; or <br /> b . Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered ; or <br /> c . Dedicate land in- lieu of fees, either as conservation easements or fee title ; or <br /> d . Purchase approved mitigation bank credits . <br /> 4 . Within 6 months from the effective date of the ITMMs or issuance of a building permit, whichever occurs <br /> first, the project applicant must : <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered ; or <br /> b . Dedicate land in- lieu of fees , either as conservation easements or fee title ; or <br /> c . Purchase approved mitigation bank credits . <br /> ¢- Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called . <br /> 3 <br /> Project Title : PA- 1900061 ( UP ) <br /> Landowner : St . Edwards Catholic Church Applicant : John Vierra <br /> Assessor Parcel #s : 159 - 110 -24 <br /> T , <br /> R. , Section ( s ) : <br /> Local Jurisdiction Contact : Alisa Goulart <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCP . <br />
The URL can be used to link to this page
Your browser does not support the video tag.