Laserfiche WebLink
PA-1900037 (GP) and - 2 - 19 July 2019 <br /> PA-1900031 (ZR) Project <br /> San Joaquin County <br /> Protection Agency (USEPA). Basin Plan amendments only become effective after <br /> they have been approved by the OAL and in some cases, the USEPA. Every three <br /> (3) years, a review of the Basin Plan is completed that assesses the <br /> appropriateness of existing standards and evaluates and prioritizes Basin Planning <br /> issues. For more information on the Water Quality Control Plan for the Sacramento <br /> and San Joaquin River Basins, please visit our website: <br /> http://www.waterboards.ca.gov/centralvalley/water issues/basin plans/ <br /> Antidegradation Considerations <br /> All wastewater discharges must comply with the Antidegradation Policy (State <br /> Water Board Resolution 68-16) and the Antidegradation Implementation Policy <br /> contained in the Basin Plan. The Antidegradation Implementation Policy is <br /> available on page 74 at: <br /> hftps://www.waterboards.ca..qov/centralvalley/water issues/basin plans/sacsir 201 <br /> 805.pdf <br /> In part it states: <br /> Any discharge of waste to high qualify waters must apply best practicable <br /> treatment or control not only to prevent a condition of pollution or nuisance from <br /> occurring, but also to maintain the highest water quality possible consistent with <br /> the maximum benefit to the people of the State. <br /> This information must be presented as an analysis of the impacts and potential <br /> impacts of the discharge on water quality, as measured by background <br /> concentrations and applicable water quality objectives. <br /> The antidegradation analysis is a mandatory element in the National Pollutant <br /> Discharge Elimination System and land discharge Waste Discharge Requirements <br /> (WDRs) permitting processes. The environmental review document should <br /> evaluate potential impacts to both surface and groundwater quality. <br /> II. Permitting Requirements <br /> Construction Storm Water General Permit <br /> Dischargers whose project disturb one or more acres of soil or where projects <br /> disturb less than one acre but are part of a larger common plan of development that <br /> in total disturbs one or more.acres, are required to obtain coverage under the <br /> General Permit for Storm Water Discharges Associated with Construction Activities <br /> (Construction General Permit), Construction General Permit Order No. 2009-009- <br /> DWQ. Construction activity subject to this permit includes clearing, grading, <br /> grubbing, disturbances to the ground, such as stockpiling, or excavation, but does <br /> not include regular maintenance activities performed to restore the original line, <br /> grade, or capacity of the facility. The Construction General Permit requires the <br /> development and implementation of a Storm Water Pollution Prevention Plan <br /> (SWPPP). For more information on the Construction General Permit, visit the State <br /> Water Resources Control Board website at: <br /> http://www.waterboards.ca.gov/water iss u es/p rog ram s/sto rmwater/co n stperm its.sht <br /> ml <br />