My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012547
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1123
>
2600 - Land Use Program
>
PA-1900046
>
SU0012547
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2019 2:30:28 PM
Creation date
11/5/2019 2:27:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012547
PE
2631
FACILITY_NAME
PA-1900046
STREET_NUMBER
1123
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
STOCKTON
Zip
95215-
APN
10320008
ENTERED_DATE
9/13/2019 12:00:00 AM
SITE_LOCATION
1123 N JACK TONE RD
RECEIVED_DATE
9/13/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br /> Community Development Department <br /> PA-1900046 (SA) <br /> 4. The Regional Transportation Impact Fee shall be required for this application.The fee is due and <br /> payable at the time of building permit application.The fee will be based on the current schedule at <br /> the time of payment. (Resolution R-06-3 8) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards.Retention basins shall be fenced with six(6)foot high chain link fence or <br /> equal when the maximum design depth is 18 inches or more.Required retention basin capacity <br /> shall be calculated and submitted along with a drainage plan for review and approval,prior to <br /> release of building permit. (Development Title Section 9-1135) <br /> 7. The owner shall execute an Irrevocable Offer to Dedicate Road to result in a forty-two(42)foot <br /> wide right-of-way from the centerline of Jack Tone Road to the property line across the parcel's <br /> frontage. (A fee based on the current fee schedule is required for processing per Development Title <br /> Table 9-240.2 in addition to a copy of the Grant Deed and a legal description of the parcel to be <br /> offered for dedication.) (Development Title Section 9-1150.5) <br /> 8. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee <br /> is due and payable prior to issuance of the building permit. The fee will be based on the current <br /> schedule at the time of payment. (Development Title Section 9-818.4 and Resolutions R-91-327,R- <br /> 94-185 and R-97-5) <br /> 9. The proposed project disturbs less than one(1) acre of ground and is not part of a larger plan of <br /> common development. The construction phase of the proposed project shall follow best <br /> management practices of the County"Small Site Storm Water Management Plan". <br /> AT: CH <br />
The URL can be used to link to this page
Your browser does not support the video tag.