Laserfiche WebLink
employees are regulaFly employed and aGG8ssible by RE)t M9Fe thaR GRe flight ef stairs. <br /> The plans shall indicate the IE)GatiE)n ef the toilet faGilities and the travel diSt@RGe fFem <br /> work areas. <br /> (15) This project will be required to comply with the Model Water Efficiency Landscape <br /> Ordinance requirements of the California Code of regulations, Title 22, Division 2, <br /> Chapter 2.7 <br /> m. UNIFORM FIRE CODE: The following California Fire Code (CFC) requirements will be <br /> applicable to the proposed project. The following conditions shall be addressed prior to <br /> submittal of a building permit application to the Building Inspection Division. <br /> (1) CFC 507 Fire Protection Water Supply — Fire flow and hydrants shall be provided for <br /> the proposed project by the use of: CFC Appendix B. <br /> (2) If Fire Protection Systems are required they shall be installed according to the CFC, <br /> Chapter 9 and the appropriate standards and guides adopted in Chapter 35 of the <br /> California Building Code and the California Electrical Code. <br /> (3) CFC, Section 503 Fire Apparatus Access Roads — Shall be provided as required by <br /> this section. <br /> (4) CFC, Section 906 Portable Fire Extinguishers— Provide portable fire extinguishers as <br /> required by this section. <br /> (5) CFC, Section 506 Key Box—A Knox® Box shall be installed according to the local fire <br /> department's instructions. Make application-for the key box at the fire district having <br /> jurisdiction of this project. If there is an electronically controlled access gate at this site <br /> a Knox® key switch will also be required. <br /> (6) CFC, Section 5001.3.3.1 Properties of Hazardous Materials — A complete list of <br /> hazardous materials used and or stored at this site shall be provided. <br /> (7) A complete review, at building permit submittal, will require compliance with applicable <br /> codes and ordinances. <br /> (8) CFC, Section 105 Permits: Operational permit(s) may be required prior to occupancy. <br /> 2. DEPARTMENT OF PUBLIC WORKS (Contact: [209] 468-3000) <br /> a. The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six (6) foot high chain link <br /> fence or equal when the maximum design depth is 18 inches or more. Required retention <br /> basin capacity shall be calculated and submitted along with a drainage plan for review and <br /> approval, prior to release of building permit. (Development Title Section 9-1135) <br /> b. The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current <br /> schedule at the time of payment. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record. (Resolutions R-00-433) <br /> c. The Regional Transportation Impact Fee shall be required for this application. The fee is <br /> due and payable at the time of building permit application. The fee will be based on the <br /> current schedule at the time of payment. (Resolution R-06-38) <br /> Planning Commission Staff Report, Item #2 12/05/2019 — PA-1800106 (UP, RAA) 6 <br />