Laserfiche WebLink
1. The proposed use is consistent with the goals, policies, standards, and maps of the General <br /> Plan, any applicable Master Plan, Specific Plan, and Special Purpose Plan, and any other <br /> applicable plan adopted by the County. <br /> • This finding can be made because the expansion of an existing Religious Assembly <br /> — Regional use type may be conditionally permitted in the R-L (Low Density <br /> Residential) zone with an approved Use Permit application. The proposed <br /> expansion is also consistent with the goals, policies, standards and maps of the <br /> General Plan There are no Master Plans, Specific Plans, Special Purpose Plans, or <br /> any other Plans in the vicinity. <br /> 2. Adequate utilities, roadway improvements, sanitation, water supply, drainage, and other <br /> necessary facilities have been provided, and the proposed improvements are properly related <br /> to existing and proposed roadways. <br /> • This finding can be made because adequate utilities, access roads, sanitation, <br /> drainage, and other necessary facilities have been provided and the proposed <br /> improvements are properly related to existing and proposed streets and highways. <br /> The project receives sewer service from the City of Stockton and water from <br /> California Water Service. Storm drainage is retained on site. The Department of <br /> Public Works is requiring current will serve letters for these services and will <br /> require the developer to provide drainage facilities that meet the requirements of <br /> San Joaquin County Development Standards to prevent the increased runoff <br /> release rate of storm water from discharging onto other properties and to prevent <br /> offsite sediment transport. <br /> 3. The site is physically suitable for the type of development and for the intensity of development. <br /> • This finding can be made because the parcel is of adequate size and shape to <br /> accommodate the proposed expansion of buildings and all yards, building <br /> coverage, setbacks, parking areas and other requirements of the Development Title. <br /> The Site Plan shows that there is sufficient area for parking and circulation in <br /> compliance with standards of the Development Title. <br /> 4. Issuance of the permit will not be significantly detrimental to the public health, safety, or <br /> welfare, or be injurious to the property or improvements of adjacent properties. <br /> • This finding can be made because an Initial Study prepared for this project found <br /> no potentially significant environmental impacts that could not be mitigated to a <br /> less than significant level. <br /> 5. The use is compatible with adjoining land uses. <br /> • This finding can be made because the proposed use will not interfere with nor alter <br /> the current land uses on adjacent properties. Surrounding uses are residential to <br /> the north, west, and south, and the Kennedy Park Community Center is to the east. <br /> The applicant is required to construct a solid masonry wall, six (6) to seven (7) feet <br /> in height, on the northern property line which abuts residentially-zoned properties. <br /> This will ensure compatibility with existing residential development adjacent to the <br /> project site. <br /> Planning Commission Staff Report, Item #2 12/05/2019— PA-1800106 (UP, RAA) 2 <br /> o,..A.. 4 <br />