Laserfiche WebLink
Potentially Less Than Less Than Analyzed <br /> Significant Significant with Significant No In The <br /> 9 Mitigation 9 <br /> Impact Incorporated Impact Impact Prior EIR <br /> V. PUBLIC SERVICES. <br /> a)Would the project result in substantial adverse physical <br /> impacts associated with the provision of new or physically <br /> altered governmental facilities, need for new or physically <br /> altered governmental facilities, the construction of which <br /> could cause significant environmental impacts, in order <br /> to maintain acceptable service ratios, response times or <br /> other performance objectives for any of the public <br /> services: <br /> Fire protection? ❑ I'ki ❑ ❑ <br /> Police protection? ❑ 1-1 11X�11 1-1 ❑ <br /> Schools? El F � ❑ <br /> Parks? F� ❑ X ❑ a <br /> Other public facilities? ❑ ❑ I'ki ❑ ❑ <br /> Impact Discussion: <br /> a) The proposed project is a revisions of approved actions for a previously approved expansion of an existing religious <br /> assembly. The project site is located in the Montezuma Fire District and the Stockton Unified School District. Both <br /> agencies were provided with the project proposal and invited to respond with any concerns or conditions. A response <br /> was not received from either agency. The project site is served by the San Joaquin County Sheriffs Office. The office <br /> was provided with the project proposal and invited to respond with any concerns or conditions. A response was not <br /> received from that office.As proposed, the project is not anticipated to result in a need for a substantial change to public <br /> services. <br /> PA-1800106 (RAA, UP)—Initial Study 24 <br />