Laserfiche WebLink
SJVUAPCD Indirect Source Review 11/27/19 <br /> Complete Project Summary Sheet & 4:07 pm <br /> Monitoring and Reporting Schedule <br /> (District Enforced Emission Reduction Measures Continued) <br /> Enforcing Agency Measure Specific Implementation Measure For District Review <br /> Compliance <br /> SJVAPCD Construction and For each project phase, all Ongoing <br /> Operation - Recordkeeping records shall be maintained (Compliance Dept. <br /> on site during construction Review) <br /> and for a period of ten years <br /> following either the end of <br /> construction or the issuance <br /> of the first certificate of <br /> occupancy, whichever is later. <br /> Records shall be made <br /> available for District <br /> inspection upon request. <br /> SJVAPCD Construction and For each project phase, Ongoing <br /> Operational Dates maintain records of(1) the (Compliance Dept. <br /> construction start and end Review) <br /> dates and (2) the date of <br /> issuance of the first certificate <br /> of occupancy, if applicable. <br /> SJVAPCD Increase Diversity Project located in various land When operational <br /> uses (Compliance Dept. <br /> Review) <br /> SJVAPCD Improve Destination 0.1 miles (distance to When operational <br /> Accessibility downtown orjob center) (Compliance Dept. <br /> _ __ Review) <br /> SJVAPCD Increase Transit 1/2 mile or less distance to When operational <br /> Accessibility transit station (Compliance Dept. <br /> Review) <br /> SJVAPCD Improve Pedestrial Within Project Site and When operational <br /> Network Connecting Off-Site (Compliance Dept. <br /> Review <br /> Number of District Enforced Measures: 7 <br />