My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012523
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
4170
>
2600 - Land Use Program
>
PA-1900178
>
SU0012523
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:19 AM
Creation date
11/6/2019 9:25:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012523
PE
2631
FACILITY_NAME
PA-1900178
STREET_NUMBER
4170
Direction
E
STREET_NAME
STATE ROUTE 88
City
STOCKTON
Zip
95215-
APN
10118018
ENTERED_DATE
9/4/2019 12:00:00 AM
SITE_LOCATION
4170 E HWY 88
RECEIVED_DATE
9/3/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-4. Single Phase Development <br /> Start of Construction(Month/Year): '", Gross Acres: , <br /> End of Construction(Month/Year): h Net Acres(area devoted to buildings/structures): , <br /> First Date of Occupation(Month/Year): Paved Parking Area(#of Spaces): 1,(0 <br /> Building Square Footage: Number of Dwelling Units: <br /> J. On-Site Air Pollution Reductions (Mitigation Measures) <br /> Listed below are categories of possible mitigation measures that will reduce a project's impact on air quality. If a category is <br /> applicable to the project,check"Yes",and please complete the corresponding page to identify specific mitigation measures within <br /> that category. If a category is not applicable to the project,check"No". <br /> 1. Construction Clean Fleet(making a commitment to using a construction fleet that will achieve the emission reductions required by <br /> District Rule 95 10) <br /> ❑ Yes,please complete mitigation measure 1 <br /> 10 AQ, <br /> Use/Location (e.g.increased density,improve walkability design,increase transit,etc.) <br /> ovos, <br /> please complete applicable mitigation measures 2a through 2f <br /> 3. Neighborhood/Site Enhancements(e.g.improve pedestrial network,traffic calming measures,NEV network,etc.) <br /> ❑ Yes,please complete applicable mitigation measures 3a through 3c <br /> I No <br /> 4. Parking Policy/Pricing(e.g.parking cost,on-street market pricing,limit parking supply,etc.) <br /> ❑ Yes, please complete applicable mitigation measure 4a through 4e <br /> No <br /> 5. Commute Trip Reduction Programs(e.g.workplace parking charge,employee vanpool/shuttle,ride sharing program,etc.) <br /> ❑ Yes,please complete applicable mitigation measures Sa through 5f <br /> No <br /> 6. Building Design(e.g.woodstoves or fireplaces) <br /> ❑ Yes,please complete mitigation measure 6 <br /> A No <br /> 7. Building Energy(e.g.exceed title 24,electrical maintenance equipment) <br /> ❑ Yes,please complete applicable mitigation measures 7a through 7b <br /> No <br /> 8. Solar Panels(e.g.incorporate solar panels in the project) <br /> ❑ Yes,please complete applicable mitigation measure 8 <br /> JZ No <br /> 9.Electric Vehicle(EV)Charger(e.g.incorporate EV charger(s)in the project) <br /> Yes,please complete applicable mitigation measure 9 <br /> ❑ No <br /> K. Review Period <br /> You may request a five(5)day period to review a draft of the District's analysis of your project before it is finalized. However,if you <br /> choose this option,it will delay the project's finalization by five(5)business days. <br /> ❑ I request to review a draft of the District's analysis. <br /> Central Region Office: 1990 E.Gettysburg Ave.Fresno,CA 93726-0244 TEL(559)230-6000 FAX(559)230-6061 WEB www.vallevair.org <br /> Page 3 of 12 Residential/Non-Residential/Mixed-Use Application Form Revised June 28,2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.