Laserfiche WebLink
' 05 May 1997 <br /> • AGE-NC Project No 95-0112 <br /> Page 4 of 14 <br /> are summarized on Table 3 The vapor extraction pilot test was described in the PAR prepared by <br />' GAS A Final Remedial Plaii(FRP)was prepared by GAS in July 1994 Soil vapor extraction(SVE) <br /> and in-situ air sparging (IAS) were recommended for soil and ground water reinediation at the site <br /> 1 <br /> 27 PURGED WATER/ STOCKPILED SOIL DISPOSITION <br /> On 03 September,purge water stored on the site,,vas transported to PRC Patterson,Inc , for disposal <br /> The purge water was transported under non-hazardous waste manifest by Nor Cal Oil of Turlock <br /> Purge water disposal was discussed in the Qua;tei ly Repot t - Octobei 1995 prepared by AGE <br /> Currently approximately 150 gallons of purge water is stored on-site in 55-gallon DOT drums Soil <br /> from the advancement of monitoring wells and confinnatoiy soil borings is currently stockpiled on- <br /> site on plastic sheeting and spread for aeration <br /> ' 3 0. SOIL AND GROUND WATER REMEDIATION <br /> ' • 3 1 SOIL VAPOR EXTRACTION <br /> In July 1995, an SVE/IAS system was installed inside a fenced enclosure at the southea5- co,ner of <br /> ' the Art& Artists building PVC piping was installed from RW-I and MW-1 to the extraction unit <br /> and from S WA and SW-2 to the spas ging unit Operation of the remediation system began in August <br /> 1995 Installation of the SVE/IAS system was described in the Quaff tei ly Repoi t - July 1995 <br /> prepared by GAS <br /> The SVE system extracted an average of 70 to 75 cubic feet per minute (cfm) of vapor from RW-1 <br /> during operation <br /> The SVE system operated at the site from 13 July 1995 until 26 Februaiy 1997 The extraction unit <br /> operated a total of 10,559 hours, or 74% of the time A photo-ionization detector (PIT) Thermo <br /> Environmental 580A, 10 OeV, calibrated to isobutylene) was used to monitor the extracted <br /> ' hydiocarbon vapor and SVE unit discharge on a regular basis The PID reading, elapsed engine <br /> operational time and supplemental fuel consumption was measured and recoided (Table 2) <br /> Soil vapor samples were collected in October 1995 and monthly since January 199E to inonitoi <br /> "remediation progress at the site The final vapor`sariiple was collected ori26-February 1997 -All soil <br /> vapor samples were collected in a Tedlar bags and transported in a cool container under chain-of <br /> custody to McCainpbell Analytical, Inc (MAI) in Pacheco, California Samples were analyzed <br /> . within 72-hours for TPH-g and BTE&X in accordance with EPA methods 5030 and 602, <br /> respectively <br />