Laserfiche WebLink
1. Red lights shall be placed at or near the top of the tower. <br /> 2. The tower lights and painting shall conform to all lighting and painting standards required by the <br /> Federal Aviation Administration. <br /> h. BUILDING CODE REQUIREMENTS: The following California Building Code (CBC) and San <br /> Joaquin County Ordinance requirements will be applicable to the proposed project. The following <br /> conditions shall be addressed prior to submittal of a building permit application to the Building <br /> Inspection Division: <br /> 1. A building permit for each separate structure or building is required. Submit plans, <br /> Specifications and supporting calculations, prepared by a Registered Design Professional <br /> (architect or engineer) for each structure or building, showing compliance with The 2016 <br /> California Building, Existing Building, Mechanical, Plumbing, Electrical, Energy and Fire Codes <br /> as may be applicable. Plans for the different buildings or structures may be combined into a <br /> single set of construction documents. <br /> 2. A grading permit will be required for this project. Submit plans and grading calculations, <br /> including a statement of the estimated quantities of excavation and fill, prepared by a <br /> Registered Design Professional. The grading plan shall show the existing grade and finished <br /> grade in contour intervals of sufficient clarity to indicate the nature and extent of the work and <br /> show in detail that it complies with the requirements of the code. The plans shall show the <br /> existing grade on adjoining properties in sufficient detail to identify how grade changes will <br /> conform to the requirements of the code. <br /> 3. The required plans must be complete at the time of submittal for a building permit. Plans must <br /> address building design and construction, fire and life safety requirements, accessibility and <br /> show compliance with the current California codes and San Joaquin County ordinances. A <br /> complete set of plans must include fire sprinkler plans, truss design submittals, metal building <br /> shop drawings, structural plans and calculations, plumbing, electrical and mechanical drawings <br /> and energy report. <br /> 4. A soils report is required pursuant to CBC § 1803 for foundations and CBC appendix § J104 <br /> for grading. All recommendations of the Soils Report shall be incorporated into the construction <br /> drawings. <br /> 2. DEPARTMENT OF PUBLIC WORKS (Contact: [209]468-3000, see memo dated November 22, 2019) <br /> 3. SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT (Contact: [209] 468-3420, see <br /> memo dated October 24, 2019) <br /> 4. SAN JOAQUIN COUNCIL OF GOVERNMENTS (Contact: [209]235-0600, see memo dated October 18, <br /> 2019) <br /> FOR NOTES AND INFORMATION ONLY: <br /> See San Joaquin County Council of Governments Airport Land Use Commission letter dated November 07, <br /> 2019. <br /> See San Joaquin Farm Bureau Federation letter dated November 13, 2019. <br /> See Pacific Gas & Electric letter dated October 24, 2019, <br /> See Federal Emergency Management Agency letter dated November 12, 2019. <br /> PA-1900231 —Conditions of Approval 2 <br />