Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-0500424 <br /> Lange Twins Wine Company <br /> Use Permit Application No. PA-0500424 was approved by the San Joaquin County Planning <br /> Commission on September 15, 2005. The effective date of approval Is September 25, 2005. This <br /> approval will expire on March 27, 2007, which is 18 months from the effective date of approval, <br /> unless (1) all Conditions of Approval have been complied with, (2) all necessary building permits <br /> have been secured and remain in force, and (3) all necessary permits from other agencies have <br /> been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the Issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Raymond Hoo,468-3164) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884). <br /> b. APPROVED USE: This approval is for a large winery with a processing capacity of 40,000 tons to <br /> be built out over 20 years in 7 phases (Use Type: Wineries and Wine Cellars -Winery, Large) as <br /> shown on the Plan dated July 1, 2005. The project includes tank capacity of 15.7 million gallons and <br /> 9 buildings totaling 118,283 square feet. Included with the winery are: <br /> Phase One (all building permits shall be obtained within eighteen (18) months of the date of <br /> approval): <br /> 1 <br /> 1_ 23,667 square foot building for a tank farm and storage �P_ ��j�j�✓.� <br /> 1,2. two settling ponds j�, <br /> 3. two wetlands/water treatment ponds <br /> 4. 960 square foot office ,rA P 0 p_ 131Lb yy F&,4,44,S <br /> 13P_0( 63•5-2N-cc4cr'W.a- <br /> \Z-5. 960 square foot caretaker residence P <br /> Q-13o 3�h�! — cwdt—� �*&dd► IG-� <br /> 6. ramp Rnd dump station �),q>, 76 <br /> 7. grape presses a k <br /> ,,/ 8. scale house <br /> 13P- o(anl g��-�� P <br /> 9. vineyards <br /> GP- 1-70116(0 <br /> 6I'-osbs- 1 0- a41 336 0 <br /> Conditions of Approval - 1 - . "MAPA-0500424 <br /> I'_L ' 1 s pp• 060► 3 z v-,n ' 2'�d <br /> rO,m 6 iZ( .4 d PQ� °� G ave+(o 4 � <br /> k)Y M- tW IN 1 VA4)j G P-64 6�� wr4 iii <br />