r • • <br /> r5.0 SCHEDULE <br /> The soil vapor survey will be conducted according to the schedule presented as Figure 4. <br /> Montgomery Watson anticipates that the work can be implemented within two weeks of receiving: <br /> 1)DTSC approval to proceed and 2) the permit from San Joaquin County Public Health Services. <br /> [Two weeks is assumed as a courtesy to schedule work with Subtronics and TEG.] The field <br /> investigation will require one to three days depending on conditions encountered in the field. <br /> Montgomery Watson will submit a final report to the DTSC within three weeks of completing the <br /> field work. <br /> 1 <br /> r <br /> r <br /> r <br /> r <br /> r <br /> 10 <br />