Laserfiche WebLink
Kennedy/Jenks Consultants <br /> 3.0 SCHEDULE <br /> Kennedy/Jenks is prepared to initiate the proposed scope of work as soon as the soil <br /> boring permits are approved by SJCEHD. Once the permits are obtained, Kennedy/Jenks <br /> will schedule the field work and notify the City of Lodi and SJCEHD two working days in <br /> advance of conducting the soil gas survey. <br /> The field work is expected to be completed within one day. Data preparation will begin <br /> immediately upon completion of field work and a letter report will be completed within three <br /> weeks of the field work. <br /> 318/96 8:36 AM 4 952704.01 <br /> g:\jobs\952704.01\lod i.doc <br />