Laserfiche WebLink
DULFNDD <br /> S E P tz 12008 <br /> SAN JOAQUIN COUNTY <br /> S 9E p, O <br /> WORK NOTICE ENVRQNIt TALHEALLTHDEPT. <br /> �P T' Former Manufactured Gas Plant <br /> a - m <br /> ® r 712 South Sacramento Street <br /> 4CIFOAN�P Lodi, California <br /> C <br /> September 2008 DEPARTMENT OF TOXIC <br /> SUBSTANCES CONTROL <br /> Field Work being conducted beginning the week of September 22"d <br /> The Department of Toxic Substances Control (DTSC) is distributing this notice to inform the community <br /> about upcoming field work at Pacific Gas and Electric Company's (PG&E) vacant site located at 712 <br /> South Sa,.ramento Street, Lodi, California (see map and photograph next page). From 1913 to 1928, a <br /> manufactured gas plant operated on the site. PG&E contractors, under the oversight of DTSC, plan to <br /> begin collecting samples of soil and groundwater throughout the site. These samples are being collected <br /> as part of a phased site investigation that will determine if residues from past manufacturing gas operations <br /> are present in soil and groundwater at the site. <br /> Work will take place from September 24`h through November 14th between the hours of 7:30 a.m. and 5:30 <br /> p.m. and includes the following: <br /> • The site will be cleared of vegetation and debris and a geophysical survey will be conducted. <br /> The survey will help us locate underground structures such as piping. <br /> • About 18 holes will be drilled at various locations throughout the site and in the street directly in <br /> front of the site. Soil, soil gas and groundwater samples will be collected using hand sampling <br /> equipment and a truck-mounted drill rig. <br /> • Boreholes will be filled with a concrete mixture and patched with asphalt or concrete after work <br /> is completed. <br /> • All work will be conducted in accordance with a site Health and Safety Plan. Workers may wear <br /> safety gear while working on-site and operating heavy equipment <br /> The majority of work will take place within the fenced areas of the site. Several borings will be drilled in <br /> the sidewalk and the street immediately in front of the site. During the sidewalk and street drilling <br /> activities pedestrian traffic and on-street parking will be detoured to the opposite side of the street and <br /> traffic control measures will be used. <br /> This work will be done according to the Remedial Investigation Work Plan for the site. This document <br /> can be found at: <br /> DISC— File Room Lodi Public Library <br /> 8800 Cal Center Drive 201 West Locust <br /> Sacramento, CA 95826 Street <br /> (9'6) 255-3575 Lodi, CA 95240 <br /> (209) 333-5566 <br /> In winter 2009, PG&E contractors may return to the site to conduct one or more phases of site <br /> investigation work including collection of additional soil, soil gas and groundwater samples. This data will <br /> help determine the extent of cleanup that will be necessary. <br />