My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SACRAMENTO
>
712
>
2900 - Site Mitigation Program
>
PR0528086
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 1:46:01 PM
Creation date
11/12/2019 1:32:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0528086
PE
2959
FACILITY_ID
FA0019017
FACILITY_NAME
FORMER LODI MGP
STREET_NUMBER
712
Direction
S
STREET_NAME
SACRAMENTO
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04532006
CURRENT_STATUS
01
SITE_LOCATION
712 S SACRAMENTO ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o1a Department of Toxic Substances Control ib <br /> Linda S.Adams Maureen F. Gorsen, Director <br /> 8800 Cal Center Drive Arnold Sch gger <br /> Secretary for E <br /> (, � Governor <br /> Environmental Protection Sacramento, California 95T <br /> vAPril 18 2008 h.��`J <br /> 2 2008 <br /> ENV1�,�'IiTISFRVICES H <br /> Ms. Melitta Rorty, P.G. pER <br /> Environmental Remediation <br /> Pacific Gas and Electric Company <br /> 77 Beale Street, Mail Code B24A <br /> San Francisco, California 94105 <br /> DRAFT REMEDIAL INVESTIGATION WORK PLAN, PACIFIC GAS AND ELECTRIC, <br /> FORMER LODI MANUFACTURED GAS PLANT, LODI, CALIFORNIA <br /> Dear Ms. Rorty: <br /> The Department of Toxic Substances Control (DTSC) has reviewed the Draft Remedial <br /> Investigation Work Plan, Former Lodi Manufactured Gas Plant (Work Plan) dated <br /> March 4, 2008. This Work Plan was prepared by SECOR International Incorporated on <br /> behalf of the Pacific Gas and Electric Company (PG&E). DTSC's project manager, <br /> Geological Services Unit (GSU), and Human and Ecological Risk Division provide the <br /> comments below for your consideration. Please provide a response to each of the <br /> comments. <br /> COMMENTS <br /> GENERAL COMMENT <br /> 1) A review of 2006 sampling results shows polycyclic aromatic hydrocarbons (PAHs) <br /> at high levels at the Site property boundary especially to the northeast, south, southwest <br /> and due west. Due to the nature and operation of town gas plants PAH contamination likely <br /> continues off-Site in these directions. <br /> Recommendation: Remedial investigation cannot be considered complete until the full <br /> vertical and horizontal extent of contamination is determined. Environmental samples are <br /> needed off-Site in these directions. <br /> SPECIFIC COMMENTS <br /> 1) The Work Plan discussed two and possibly three inactive water production wells on <br /> the Site. These wells should be investigated and properly decommissioned to insure <br /> against the vertical spread of Site constituents. <br /> ® Printed on Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.