Laserfiche WebLink
TABLE 1 <br /> PHASE I INVESTIGATION COSTS INCURRED BY DTSC'S CONTRACTORS <br /> AT LUSTRE-CAL, GUILD, AND BUSY BEE SITES <br /> CONTRACTORS SITES <br /> Lustre Cal Guild Busy Bee Total <br /> URS <br /> HP Investigation $25,954.31 $28,806.06_ $8,871.37 $63,631.74 <br /> Soil Gas Investigation $38,008.31 $22,258.55 $9,639.59 $69,906.45 <br /> Sewer Investigation $12,431.85 $12,431.85 <br /> Well Investigation $1,217.80 $1,400.47 $2,618.27 <br /> File Review $2,593.20 $2,337.29 $2,294.68 $7,225.17 <br /> URS Subtotal $80,205.47 $54,802.37 $20,805.64 $155,813.48 <br /> Layne Subtotal $32,134.00 $38,809.93 $16,363.09 $87,307.02 <br /> Chem Waste Subtotal $875.25 $2,975.13 $2,410.40 $6,260.78 <br /> Vector Subtotal $17,551.00 $16,713.00 $8,097.00 $42,361.00 <br /> Booze-Allen Subtotal $4,780.17 $4,780.17 <br /> Grand Total $130,765.72 $118,080.60 $47,676.13 $296,522.45 <br /> HP Investigation: Groundwater HydroPunch Investigation <br /> Sources: INVOICES <br />