Laserfiche WebLink
Page 1 of 1 <br /> Nuel Henderson [EH] <br /> From: Phil Goalwin [pgoalwin@e2cr.net] <br /> Sent: Wednesday, January 15, 2014 3:43 PM <br /> To: Nuel Henderson [EH] <br /> Cc: 'Cervantes, Roberto@Waterboards' <br /> Subject: Soil data and VE well completion for Busy Bee Lodi site <br /> Attachments: ROF Tables.xls <br /> Hi Nuell <br /> Please find attached the soil data and well completion data that I could find.As you can see the only soil data <br /> available was from MW-18 and MW-19.Those two wells I believe are located along Main St, south of Pine.All of <br /> the remediation wells were straight drilled with no sample collection. All of the soil data for MW-18 and MW-19 <br /> was ND. <br /> Just an FYI,this remediation project was essentially a groundwater-only cleanup and the vapor extraction wells <br /> were placed with a short screened interval above the water table.Their primary purpose of the vapor extraction <br /> wells was to capture VOC's liberated from the groundwater via air sparge.There was a single localized source <br /> area identified at a break in the sewer line.This source area was located along the north-south trending sewer <br /> line north of Pine St. and east of Main St.You will note that vapor wells in that area only went down to 20 feet <br /> bgs. <br /> You will also note that there are 4 "deep" monitoring wells at the site.These are the only wells that penetrate <br /> the deeper portion of the upper aquifer.These wells have been,throughout their entire history, reported as ND. <br /> They were drilled with special precautions to prevent mixing of the shallow first encountered groundwater with <br /> the deeper part of the aquifer.They were installed using a casing advance hammer-rig and conductor casing was <br /> installed to prevent mixing. <br /> If you need any further information or want to discuss the project, do not hesitate to contact me at (661) 587- <br /> 0585 or via email. <br /> Respectfully, j't_( <br /> Phil Goalwin P.G. #4779 STc c r�U�'1 lCcJi a� — 7,1 <br /> President <br /> E2C Remediation U L J 77—tom' <br /> Email secured by Check Point � .4`4 o <br /> 1/16/2014 <br />