Laserfiche WebLink
COUNTY OF SAN JOAQUIN THOMAS R.FLINN <br /> 2' Z <br /> :{ DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> P.O.BOX 1810- 1810 EAST HAZELTON AVENUE MANUEL LOPEZ <br /> •'• - -_ STOCKTON,CALIFORNIA 95201-1810 DEPUTY DIRECTOR <br /> 209/468-3000 STEVEN WINKLER <br /> O R N`P FAX:209/468-2999 DEPUTY DIRECTOR <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> September 22, 1999 <br /> Mr. Robert H. Eckhoff <br /> 395 Brannan Island Road No. 157 <br /> Isleton, California 95641-9745 <br /> SUBJECT: WATER SERVICE FOR ASSESSOR'S PARCEL NO. 015-100-21 <br /> (631 EAST AUGUSTA STREET) FROM MOKELUMNE ACRES <br /> MAINTENANCE DISTRICT <br /> Dear Mr. Eckhoff: <br /> The Mokelumne Acres Maintenance District will service the above referenced site with water, <br /> provided all necessary improvements are made to the water system which comply with State and <br /> County Standards. <br /> Annexation to the Mokelumne Acres Maintenance District will be required and all applicable <br /> connection or buy-in fees shall be paid. A Statement of Annexation Costs is attached. Please <br /> provide a copy of the Grant Deed of the property to be annexed. <br /> If any extension, connection or placement of new facilities is required to connect to the <br /> existing supply, the cost shall be borne by the applicant. An improvement plan shall be <br /> submitted for review and approval. A water meter(Sensus brand measurable in gallons) shall <br /> be installed and provided with attachment connector spud. Any interruption to the existing water <br /> system shall be done by the Utility Maintenance Division only. If any interruption to the existing <br /> water system is necessary, please contact the Utility Maintenance Division at(209) 468-3090 to <br /> perform the task. In addition, the Utility Maintenance Division shall be contacted prior to <br /> backfilling. <br /> If the existing well is to be destroyed, a permit from the Environmental Health Division shall <br /> be acquired before water will be supplied. Destruction of the well shall be completed within <br /> 30 days of hook-up. If a well is to remain on the property, an approved reduced pressure <br /> backflow prevention device will be required. The applicant shall have the reduced pressure <br /> backflow prevention device tested by a licensed tester prior to final inspection and every <br /> year thereafter at the owner's expense. A copy of the test result shall be submitted to the <br /> Utility Maintenance Division. <br />