My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012635
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
8000
>
2600 - Land Use Program
>
QX-91-0006
>
SU0012635
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 1:15:54 PM
Creation date
11/14/2019 1:08:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012635
PE
2605
FACILITY_NAME
QX-91-0006
STREET_NUMBER
8000
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236-
ENTERED_DATE
11/14/2019 12:00:00 AM
SITE_LOCATION
8000 N WAVERLY RD
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Property Address: EI Rancho Rock and Sand,Inc. CROSS SECTIONS NOTES <br /> Quarry FIGURE 4 <br /> 8000 Waverly Road,Linden,CA 1. The existing EI Rancho Rock and Sand,Inc. <br /> 95236 Quarry operation is permitted under EP 91-9, <br /> Assessor Parcel San Joaquin County Planning Department. <br /> Numbers: 093-450-01, 093-450-05, 093- 2. Proposed <br /> r a piece s <br /> expansionf mining operations to <br /> 450-06,093-450-07 <br /> \TO CONNECTION WITH <br /> P20Pfr2TY 00JJD4¢Y 3. Excavation operations shall not disturb the <br /> SHE <br /> LTON ROAD I Em-_m E�QR I existing watercourses and wetland habitats and <br /> > 300 _ stall not occur within 100 feet from the <br /> centad(ns of the natural drainage channel. <br /> —�— <br /> /� 4 SAwtD ; [�17>J/EL 4. Excavation slopes and final slopes shall not <br /> atoo 2S exceed 2 feet horizontal to 1 loot vertical. <br /> \-too+ J5 o TtY+u� EXIAV ATID�1 1,.1M1T 5. The excavation shall be set back a minimum of <br /> �5 <br /> Z1 SLOPE 25 feet from the easterly and southerly <br /> W 200 Property lines In the southern portion of the <br /> NpUIµOPO <br /> site. <br /> TO PLANT loo �ELTIQ, �-� IL In the southwestem portion of the site,the <br /> excavation shall be set back 55 feet from the <br /> 7 cel lerline ack from Waverly th3R oot-from�e 2r fool <br /> S /^� R.O.W.easement on WaverlyRoad. <br /> fine <br /> PAVEMENT FIRST 100' P2DI�T`!�Ot%NDAR-Y V 7. The excavation shell not g <br /> OF HAUL ROAD ENCROACHMENT -Q.}"�( <br /> �!. OF WAVERt ROAD uD�Y 7 feet e the round <br /> I water table,which lies a1751eet M.S.L Datum. <br /> �vrsr_r_ proposed project area Is not located within <br /> 60'R/W EASEMENT _Irr, 9. The <br /> I FOR WAVERLY ROAD �N/ayll• �' A � 1_ • Federal Flood Insurance Administration <br /> i CINE 4AVEA75, OVtcRYx�lt?'�.I' p Designated Flood Hazard Area,nor will it be <br /> ITO LANDFlLL �I� `�?„'� L <br /> ubject to flooding,es confirmed by the San <br /> Joaquin County Flood Control. <br /> Z <br /> ���� CL?•V4T10r-1 9. Final elevations within 25 feet of arty property <br /> Ltr t tTs boundary shall be equal to or grealer then the <br /> SITE ACCESS YpjLp� e rlo� L_L Tr1�ICAL SEeSjprJ p-Ij abutting property unless the elevation prior to <br /> the excavation is less than that of the abutting <br /> FIGURE 3 property,in which case the differential shall <br /> N•T•5. not be Increased. <br /> o w ao <br /> scAtF w rErr to. Existing buildings and trees In the <br /> southwestern 1/4 of the southwestern 1/4 of <br /> the property shall be removed.No native base <br /> with a trunk diameter of 6 Inches or greater <br /> shall be disturbed by excavation operations on <br /> the remainder of the site. <br /> f�WA.v6>z.E_Y 20d-a <br /> i 11. All water Wlllzed In the plain operation will be <br /> 0 stored behind closed dikes, recycled, and <br /> o�E.utautznswt-1'zo4' I _ <br /> reused In the processing operation. <br /> F 30o I 2!I I LPPE ZSR�J� �i 12. Final contour linea depict approximate limits of <br /> �D jJ given time will dependual pupon overbof tion at any <br /> urden and <br /> E%LAVATILafJ LIMITS [- Inlarburdan encounlared. <br /> 13. The site is to be reclaimed for cable grazing <br /> �I �- SILT LL AY `^II MIr.t 0f2- SN•t0 (�fLAVlcI� I mrrgeland upon the conclusion of excavation <br /> SS Operatlons. Overburden and topsoil will be <br /> J Zoo <br /> replaced on the pit Roar. <br /> I <br /> 14• removed <br /> from <br /> processing completistallM <br /> CL removed Irom tta she upon completion. <br /> C 15. Maximum anticipated depth of excavation Is 40 <br /> "L Clay lenses will determine the exact <br /> So depth. <br /> b No. Sheet <br /> CMM tR9 EL RANCHO ROCK AND SAND, INC. <br /> CMM ate AS SHOWN SITE ACCESS <br /> 2 <br /> CONDOR MINERALS MANAGEMENT INC r..ewi avorn APR 91 CROSS SECTIONS & NOTES of <br /> Dfern k IRACES <br />
The URL can be used to link to this page
Your browser does not support the video tag.