Laserfiche WebLink
AN& A90k <br /> BREWER, PATRIDGE, MORRIS <br /> • A PROFESSIONAL LAW CORPORATION" <br /> 1209 NORTH EL DORADO STREETDEC <br /> n <br /> THOMAS F BREWER P 0. BOX 270 Phi 4' 56 <br /> Joy J. PATRLDGE STOCKTON, CALIFORNIA 95201 <br /> JAMES M. MORR'% TELEPr OtiE 12091 <br /> GEORGE K GISSON SMITH, GREEN <br /> December 20, 1982 <br /> HAND DELIVERED <br /> Mr. Mark Stephen Adams <br /> Mayall, Hurley, Knutsen, Smith & Green <br /> A Professional Corporation <br /> 37 Hunter Square Plaza <br /> Stockton, CA 95202 <br /> Re: Cady v. Stockton Sand and Gravel <br /> Dear Mr. Adams: <br /> this will ceipt of your <br /> Sandletter <br /> and GYavel'scProporsed,mod82 <br /> addressing the subseC <br /> fications to the bridge crossing the Calaveras River. <br /> Your response to the conditions imposed by Mrs. Cady (through Roger <br /> Sitkin) do not meet tu�derlying concernss of my letter . you of Before cons�enetr16 can be <br /> nor <br /> Mrs. <br /> Cady's and Mr. <br /> granted, the following conditions must be met: <br /> 1. A copy of the plans detailing the work to be done must be <br /> furnished to this office. <br /> 2• U-iie San ,Joaquin Department of Public Works must indicate to <br /> us that they have approved the plan. <br /> 3 'Ihe hours and specific dates work is to be performed are to <br /> be stated together with such qualifications on weather conditions that <br /> may be relevant. <br /> 4. We will require a statement from Stockton Sand <br /> the bridge's <br /> engineer to the effect that once the repairs are comp <br /> will maintain a 40 ton band ridge. repairs will not adversely affect <br /> e <br /> the structural grity <br />