Laserfiche WebLink
.P .E.A.-- Excavation <br /> Page 5 <br /> 5. ghat type and volume of material is to be removed? <br /> "Tailings" and native aggregate material . <br /> 6. How many cubic yards of material will be removed <br /> in each phase of operation? <br /> Z <br /> 228,000 � , <br /> ZZ 187,000 <br /> ZZI 297 ,000_ VC J 2 <br /> IV future unknown SAN jOAi UIN COUN-'Y <br /> PLANNING DE-P'A.F?7MLNT <br /> V <br /> 7, What is the maximum depth of excavation? <br /> 20 feet (approximately) <br /> 8. will any overburden be removed? If so what type <br /> of material? How deep 1-3 feet ? <br /> How many cubic yards? • <br /> 9e What will be done with the overburden? <br /> Storage for use during rehabilitation phases . <br /> 10. Will any trees or vegetation be removed? Describes. <br /> Native grasses to be removed; no trees . <br /> 11. When will the excavation begin? How long will <br /> each phase take? <br /> I 112 years As the market develops , <br /> application for renewal <br /> II 12 years of this permit would be <br /> made. <br /> III 2 years <br /> IV <br /> V <br /> 12. What are the proposed days and hours of operation? <br /> Monday through Saturday; 5 A.M. to 9 P. I. <br /> " Revis,7 7.9-27-81 <br />