Laserfiche WebLink
DRAFT ".IVIRONMFNTAL IMPACT REPORT <br /> STOCK"-,AT SAND NIT) GF'AW,.L EXCAVi,,`_70"T <br /> (C/O POS; PUi2V:'ArIC..9) <br /> is ill-81-5/r.P-81-9 <br /> I. DESCRIPTION OF THE PROJECT <br /> A. I-ocation <br /> The project site is located approxiwFj-f: .l,r 10 mi les east (-f <br /> Iai.nOcn, on the east side of WaverlNr one•- 714al_f m{iln <br /> south of Shelton road. <br /> Map 1 shows the project vicinity. The Stanislaus County <br /> line is iust east of the site and the 2 Calaveras .-iver Js <br /> lo'c1t c,:, ti h,r,ut I rile o nrlan t!) t.h(� norh. <br /> Records of the CountN' Assessor identify the site with hnr-lz <br /> 00-3, page 450, parcels 01 and 05, 247- acres and 200 acre <br /> respectively. The project area, roughly 4 acres, wi.11 b-i <br /> leased bs, the applicant, Stoc?.ton Sand and G::avcl_, for <br /> pu.rpca4s a€ excavaticn. <br /> B. Objective <br /> The applicant's primary objective is a quarry exc<.vaticn. c; <br /> 73.2.,CC"O cultic yards or drea(.-e ta.4 ?.irrfs vn L-� removed over <br /> a 5 y-ca*r pori.e..a T`,c tai-lines are Left c„>>er :. ."n a gold <br /> mi__n4.-g cp rc:ti.on that tock Place about 40 .,:i—rc ago. <br /> °Z ,,c ar-pl_iecant has an existing sand and gravel oporation <br /> along the Calaveras i?i_ve.r, roughlk, 2 Miles northlwcst of the <br /> Frcicct site. The Permit for the Calaveras River rite <br /> (ED-00-2) expires O”hoer l.'., 1953, although the appl -rant <br /> hast'�i:ed that the ezcati7Ut_.on work is near completion t <br /> tic?..:a t?..P..c. <br /> Eguipmcnt currently in use at the Calaveras Fiver site will <br /> be r,,mIvc i to tile rroposed site in year two of the proposed <br /> prcjpcc:t. xggregat-.e removed will be processed and :"::ochpil.ed <br /> on: si_to and then cold to custo^^rs for use In construct.i.o:I <br /> proiect•.s el.sc%•)hore i.n the county. Tiho processing c-.,u3.rMCnt <br /> inclu-'I rc:--k cru:7,he s, washers, screen rradeTMs, ane? ccn- <br /> veyors, The final products will be various sides of sand <br /> and gravel. ' <br /> The applicant also proposes to construct asphalt end ce::r,^nt <br /> batching plants. Both plants will utilise r._11 cer ial.s <br /> extracted on-sine and will produce ca_ structi cn-o'cintecl <br /> products, such as road topping, rQ:d b .se, a.nc, structure <br /> foundations. <br /> Two additional cormtercial activities will ha conducted along <br /> with the sand and gravel operation. Lip to 100, 000 cubic <br /> -1- <br />