Laserfiche WebLink
Wash water will then bQ forwardr�d to a set`.ti.ng pond <br /> east of tl^ , processing area a.nr! retained use in <br /> reclamation. <br /> Any stockpiling of material will be adjzccn� to the <br /> processing area. naterial.s will be from the <br /> pr-crrii_r' by trucks a�inod by thea.pp'_ _cam:.,t Or its <br /> ctls t O7-OS. <br /> Zhe gold mining operation will be condu..ctc' at -hc% <br /> sar.:3 time as the sand and gravel operatic-i, V"1.4 s <br /> asp^_ct of the project will consist or gold <br /> frcm the other materials during the sarccn i.ng and <br /> washing processes. <br /> 2. Reclamation <br /> Reclamation will proceed at the same time as the <br /> encrava ui.on. Stored overburden (topsoil) f:_-c :i previous <br /> and pl.amned excavations, and sediment rrrc n. washing <br /> operations,, wil_l L3 placed cn excavated areas aft.or <br /> rcr:-^mml operati.ons have been completcd? Fat,ive <br /> grasses and similar gegetaticn rni.tahl.e for graving <br /> will, be rec.tablishcd in thcsc �reas„ T•'c:^h vrat-.n:- <br /> from the .scdixiorYtati.cn pone': will, he uscd fY.~ i.rri.c-ation <br /> of .'�.e grasscv Tla ntcc'. Subsc7,r -ntl y, ;-hr` ]and Will <br /> be used for cattle grazing. <br /> Z"ae grade of the final excavatio- surface 'pill be <br /> gcr"j 1�� <br /> sloping, generally -less t an <br /> -6- <br />