Laserfiche WebLink
Item No. 8 <br /> BA: 8-27-81 <br /> EP-81-9,/EIR-81-5 <br /> Page 1 <br /> California Department of Conservation : <br /> Because the volume of excavation exceeds 1, 000 cubic yards per acre, <br /> a mine reclamation plan is required under the Surface Mining and <br /> Reclamation Act of 1975. We recommend that a copy of the reclamation <br /> plan be sent to the State Geologist for review. Attached CDMG Special <br /> Publication 51, State Policy for Surface Mining and Reclamation <br /> Practice, California State Mining and Geology Board, is recommended as <br /> a guideline in the preparation of the reclamation plan. <br /> Planning Department Response : <br /> Planning staff recommends that the applicant submit a reclamation plan <br /> acceptable to the Conservation Department prior to any excavation that <br /> may be approved. <br /> San Joaquin County Public Works Department : <br /> The site would not be subject to flooding from an intermediate Regional <br /> Flood. Waverly Road has an existing right-of-way width of 60 feet, and <br /> a planned right-of-way width of 60 feet. <br /> Planning Department Response: <br /> None required. <br /> United States Department of Agriculture, Soil Conservation Service: <br /> The mitigation measures of settling ponds and rehabilitation should <br /> be strongly assured. Rehabilitation following project completion should <br /> be made to follow existing contours and grades as much as possible, <br /> followed by reseeding to a fast-establishing annual grass species mixture. <br /> This agancy can provide recommendations in that regard to the contractor <br /> if requested by the contractor. <br /> Planning Department Response : <br /> None required. <br /> Stockton Sand and Gravel, Inc. (Lawrence Deimler, Project Engineer; <br /> Don Merian) : y <br /> Comments to be discussed at public hearing. Revised excavation and <br /> rehabilitation statement, maps, schedule, Preliminary Environmental <br /> Assessment, and comments on Draft EIR to be included by Addendum to <br /> DEIR. Planning staff response to comments received on DEIR will be <br /> included in public hearing minutes, which will be included as an <br /> Addendum to the DEIR. <br /> AA-11 <br />