Laserfiche WebLink
ADDENDUM B <br /> REHABILITATION STATEMENT <br /> STOCKTON SAND & GRAVEL <br /> EIR 81-5/EP 81-9 <br /> All areas excavated under this permit will be rehabilitated prior <br /> to completion of the project (see attached schedule) . The planned <br /> rehabilitation involves : <br /> 1. Placing and shaping stored overburden and sediment on excavated <br /> areas; <br /> 2. Native grasses and other vegetation suitable for grazing will be <br /> re-established as excavation operations are completed in the <br /> various areas. Wash water from the sedimentation ponds will be <br /> used for irrigation. <br /> If economic conditions warrant expansion of this project to the <br /> east, the equipment to be utilized by this project might remain in this <br /> area for processing material from future excavations . If the project is <br /> not expanded, equipment, structures, etc. will be removed from the site <br /> on completion of work. <br /> (See attached schedule) <br /> BB-1 <br />