Laserfiche WebLink
Page 5 <br /> 5. What type and volume of material is to be removed? <br /> "Tail-'ogs" and native aggregate material . <br /> 6. How many cubic yards of material will be removed <br /> in each phase of operation? <br /> I 369,000 <br /> II — 209,000 <br /> III 134,000 <br /> IV future unknown <br /> V - <br /> 7. What is the maximum depth of excavation? <br /> 20 feet (approximately) <br /> 8. Will any overburden be removed? If so what type <br /> of material? How deep 1-3 feet ? <br /> How many cubic yards? <br /> 9. What will be done with the overburden? <br /> Storage for use during rehabilitation phases. <br /> 10. Will any gees or vegetation be removed? Describe. <br /> Native grasses to be removed; no trees. <br /> 11. When will the excavation begin? How long will <br /> each phase take: Mediately <br /> I _ 3; Years As the market develops , <br /> application for renewal <br /> II 2; years of this permit would be <br /> made. <br /> IZI 1; years <br /> IV <br /> V <br /> 12. What are the proposed days and hours of operation? <br /> Monday through Saturday; 5 A.M. to 9 P.M. <br /> Revised 8-13-81 <br /> BB-3 <br />