Laserfiche WebLink
as <br /> t ! i NTIAL STUDY <br /> WILL THE PROJECT HAVE A SIGNIFICANT EFFECT a <br /> v T THROUGH ANY OF THE FOLLOWING IMPACTS? <br /> ' . EP-81-9 01-- <br /> A <br /> ZO <br /> a. Contaminate public water supplies . . . . . . . . . . . . . . . . . . . . . ❑ ❑ <br /> b. Conflict with existing,established,conforming land uses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ❑ ❑ <br /> C. Have a substantial,demonstrable,negative aesthetic effect. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ❑ ❑ �] <br /> d. Substantially degrade surface or ground water quality . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ❑ ❑ <br /> e. Substantially deplete surface or ground water resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ❑ ® ❑ t <br /> F I. Substantially interfere with ground water flow or recharge . . . . . . . . . . . . . . . . . . ❑ ❑ <br /> U g. Conflict with adopted plans,goals or policies of San Joaquin County ❑ ❑ (� <br /> 6 <br /> IL h. Cause a significant effect related to flooding,erosion or siltation . ❑ L ❑ <br /> J ,. Substantial alteration of natural topography,soil or subsoil features <br /> ❑ lr� ❑ <br /> a j. Disrupt or divide the physical arrangement of an rsteblished community ❑ ❑ <br /> F <br /> z k. Cause or allow substantial increase in consurnpiion of natural resources . Sand, And .grove 1, _ _ . , . . _ , ❑ r-3q ❑ <br /> W <br /> f I. Induce substantial growth,concentration or displacement of population . . . . ❑ El rXi <br /> Qm. Substantially increase the ambient noise or glare levels for adjoining areas . . . . . . . . . ❑ ❑ <br /> LF j <br /> n. Substantially affect rare or endangered species of,mimal or plant or their habitat ❑ (� ❑ <br /> z o. Breach published national,state,or local standards relating to solid waste or litter control . ❑ D IN <br /> y <br /> I P. Substantially interfere with the movement or habitat of any species of fish,wildlife or plant. . . . . . . . . . . . . . . . . . . . El ❑ x❑ <br /> q. Encourage activities which will result in the use of large amounts or waste of fuel or energy . . . . . . . . . . . . . ❑ ❑ <br /> ' r. Necessitate major extensions o' sewer,water,electrical,gasoline or te!ephone lines or public roads ❑ ® [� <br /> W . <br /> i S. Except as part of a scientific study,disrupt or alter an archaeological,historic,or paleontological site ❑ ❑ <br /> w I t. Increase exposure of individuals or property to geological,public health,traffic,flooding related,or other hazards . . . . . . . . . ❑ EX ❑ <br /> w I <br /> s I u. Violate any ambient air quality standard,substantially contribute to an existing or projected <br /> a air quality violation.or expose sensitive receptors to substantial pollutant concentration . . . . . . . . . . ❑ ❑ jX, <br /> v. Substantially increase demand for,or utilization of existing public <br /> facilities or services such as schools,or fi,e or police protection . . . . . . . . . . . . . . . . . . _❑ ❑ <br /> w. Substantially change transportation patterns related to existinc traffic <br /> load,street capacity,parking availability,mode of travel or traffic safety . . . . . . . . . . . . . . . . . . . . . . . . . . . E ❑ n <br /> Adverse impacts of project and their magnitude. _Removal of sand and ravel; site may be subject <br /> to local flooding; disturbance of soil may increase erosion; local vege= <br /> i tation will be removed;-any archaeological resources may -disruptedt___ <br /> and topographic changesmav alter stream hvdrology�__—_�_—_- <br /> Mitigation measures offered by developers to reduce adverse impacts: NO trees will be removed; dust <br /> control measures; settling Ponds to prevent water pollution, allow <br /> recycling of water. <br /> I CompatiJaility of project with existing or proposed The agricultural zone General Plan,zoning or land aces: g <br /> permits quarry excavations on nonproductive soils ; rehabilitation. <br /> ❑ Accept Negative Declaration on the following basis: ® Require Environmental Im;iact Report for following reasons: <br /> The Initial Study _indicates that this project may have a significant <br /> 7 Y -- <br /> impact on the environment. <br /> Based on this initial study,and any supplemental information attached,any vossible significant affects have been identified and are attached with mitigation <br /> measures. From this information,it has been determined that: <br /> ❑ This project is exempt. <br /> On the basis of this initial study,we find that the proposed project could not have a significant effect on the environment,and a NEGATIVE <br /> DECLARATION will be prepared. <br /> ❑ Although the proposed project could have a significant effect on the environment,there will not be a significant effect when the mitigation <br /> 1 measures described above,or on the attached sheets,have been added to the project.A NEGATIVE DECLARATION WILL BE PREPARED. <br /> I <br /> The proposed project MAY have a significant effect on the environment and an <br /> ENVIRONMENTAL IMPACT REPORT will be prepared. ROBERT S.HUNTER,Environmental Review Officer <br /> ❑ ENVIRONMENTAL IMPACT REPORT E.I.R. —.—HAS BEEN ByR•_ Schaffer sate 2-13-81 <br /> 1 PREPARED FOR THIS PROJECT. <br /> -I <br />