My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012712
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
909
>
3500 - Local Oversight Program
>
PR0544983
>
ARCHIVED REPORTS_XR0012712
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 8:43:28 AM
Creation date
11/14/2019 4:57:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012712
RECORD_ID
PR0544983
PE
3528
FACILITY_ID
FA0005197
FACILITY_NAME
GARYS EXXON SERVICE STATION
STREET_NUMBER
909
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
909 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,r. <br /> i <br /> 1. SITE CONTACTS <br /> e:ation Number: Former Exxon Retail Site(RS)7-1050 <br /> Station Address: 909 West Hammer Lane <br /> Stockton,California <br /> Exxon's Project Manager: Ms. Debbie Harris <br /> Exxon Company,U.S.A. <br /> 1200 Smith Street,Room?1123 <br /> Houston,Texas 77002 <br /> - (714)656-7755 <br /> Consultant to Exxon: EA Engineering,Science,and Technology <br /> 41 Lafayette Circle <br /> Lafayette,California 94549 <br /> (415)283-7077 <br /> - EA Project Geologist: Alec Winters <br /> Site Location Map: Figure 1 <br /> 2. ACTIVITIES OCTOBER 1990 THROUGH MAY 1991 <br /> Groundwater Sampling,27 December 1990 The eight monitoring wells were gauged, and <br /> MWI, MW2,MW6,MW7,and MW8 (Figure 2) were sampled. MW3,MW4,and MW5 were <br /> dry. Samples were submitted under chain of custody to Pace Laboratories,where they were <br /> analyzed for total petroleum hydros;rbons (TPH) by DHS-modified EPA Method 8015 and for <br /> benzene,toluene,ethylbenz?ne,and xylenes(BTEX)by EPA Method 8020. <br /> Groundwater Sampling,29 March 1991 The eight monitoring wells were gauged,and MWI, <br /> MW2,MW6, MW7, and MW8 (Figure 2) were sampled. MW3, MW4, and MW5 were dry. <br /> Samples were submitted under chain of custody to Med-Tox Associates,Inc.,where they were <br /> analyzed for total petroleum hydrocarbons(TPH)by DHS-modified EPA Method 8015 and for <br /> benzene,toluene,ethylbenzene,and xylenes(BTEX)by EPA Method 8020. <br /> Concentrations of petroleum hydrocarbons greater than the method detection Iimits wLre mcas- <br /> ured in the samples taken from well MW6(Table 1). MW6, which replaces MW3,is located in <br /> the former tank field and is surrounded on four sides by the other wells. Copies of the laboratory <br /> analytical reports for the December 1990 analyses are provided as Appendix A. Copies of the <br /> laboratory analytical reports for the March 1991 analyses are included as Appendix B. Well <br /> �. sampling field forms for the December 1990 sampling are included as Appendix C. Well sam- <br /> pling field forms for the March 1991 sampling are included as Appendix D. A cumulative histo- <br /> -- - ry of analytical results of groundwater sampling since 1986 is provided in Table 2. <br /> .sip iawnn.yvUyu 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.