My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012712
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
909
>
3500 - Local Oversight Program
>
PR0544983
>
ARCHIVED REPORTS_XR0012712
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 8:43:28 AM
Creation date
11/14/2019 4:57:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012712
RECORD_ID
PR0544983
PE
3528
FACILITY_ID
FA0005197
FACILITY_NAME
GARYS EXXON SERVICE STATION
STREET_NUMBER
909
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
909 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Arm <br /> Exxo;, Company, U.S.A. <br /> QUARTERLY SUMMARY REPORT <br /> June-September 1991 <br /> Date: 11 October, 1991 <br /> RAS #7-1050 <br /> 909 Hammer Lane <br /> Stockton,California <br /> WORK PERFORMED THIS QUARTER: <br /> On 16 September 1991, groundwater from five of eight groundwater monitoring wells was <br /> sampled,and the samples were analyzed for petroleum hydrocarbons. <br /> A vapor extraction system has been op_rating at the site to remediate soils in the former tank <br /> field. <br /> QUARTERLY GROUNDWATER SAMPLING(09116191)RESULTS: (ug(L) <br /> Well Ethyl- TPH Historical <br /> We <br /> WelBenzene Toluene benzene Xylenes Gasoline Trend <br /> No.MWI. <0.5 <0.5 <0.5 <0.5 <50 Unchanged <br /> MW2 <0.5 <0.5 c9.5 <0.5 <50 Unchanged <br /> MWb <0,5 <0.5 <0.5 <0.5 <50 Unchanged <br /> MW7 <0.5 <0.5 <0.5 <0.5 <50 Unchanged <br /> MW8 <0.5 <0.5 <0.5 <0.5 <50 Unchanged <br /> FREE PRASE PRODUCT RECOVERY SUMMARY: <br /> Free product recovered this qu,arter: Not applicable <br /> Cumuladve total product recovered: Not applicable <br /> WORK TO BE PERFORMED NEXT QUARTER: <br /> 1) The vapor extraction and treatment will continue. <br /> 2) Groundwater will be sampled,and the samples will be chemically analyzed for TPF and <br /> BTEX. December 1991 <br /> WC-aK TO BE PERFORMED NEXT 12 MONTHS: - _ - -- <br /> Quarterly sampling and a n thewillbentnued to monitor the decline of concentrations of <br /> petroleum hydrocar groundwater. <br /> i <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.