My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012712
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
909
>
3500 - Local Oversight Program
>
PR0544983
>
ARCHIVED REPORTS_XR0012712
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 8:43:28 AM
Creation date
11/14/2019 4:57:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012712
RECORD_ID
PR0544983
PE
3528
FACILITY_ID
FA0005197
FACILITY_NAME
GARYS EXXON SERVICE STATION
STREET_NUMBER
909
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
909 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EV <br /> A <br /> E5,INC. <br />'E 269 MocntHernon Fd <br /> suile 101 <br /> I 5c-cn Valley.CA 950G6 <br /> (418148&7511 <br /> F'4X(40614,V-515 <br /> 2 October 1991 <br /> .Eris. Debbie }Farris • ,, _,,,:, u�i'cr�.Llii <br /> r.Iti]��1�4`sio <br /> Exxon Company, U.s.A. PRfI],1! E `JlES <br /> P.O. Box. 4415 <br /> Houston, Texas 77210-4415 <br /> SUBJECT: Vacuum Extraction System <br /> Exxon Station RS #7-1050, <br /> Stockton, California <br /> Dear Ms. Harris: <br /> The system was monitored on 12 September and 24 September 1991 at the <br /> subject site. The results are presented in the attached table for your <br /> review. Also enclosed are copies of the laboratory report. <br /> Although the extraction system has been operating at near peak <br /> capacity, well and air stream data indicates low TVH concentrations. A <br /> portable GC-FID will be used during the next monitoring event to verify <br /> TV concentrations of individual vapor points. We will contact you with <br /> the results in order to discuss possible new borings at the site. <br /> The system operated for 22 of the 25 days during the past interval, <br /> from 29 August to 24 September 1591. The system was down for three <br /> days due to mechanical difficulties. Between 8 March and 24 September <br /> 1491, approximately 1,321.1 pounds of hydrocarbons and 60 pounds of <br /> benzene have been removed from the soil. <br /> Please do not hesitate to call if you have any questions. <br /> Sincerely, <br /> EVAX Technologies, Inc. <br /> �hEt�i� �7A-�LCt12ct.irr.L <br /> - �5 <br /> Shaw Garakani <br /> Project Engineer <br /> cc: Mr. Harlin Knoll, San Joaquin County Environmental Health <br /> - - Department <br />
The URL can be used to link to this page
Your browser does not support the video tag.