My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012713
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
909
>
3500 - Local Oversight Program
>
PR0544983
>
ARCHIVED REPORTS_XR0012713
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 9:14:52 AM
Creation date
11/14/2019 4:59:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012713
RECORD_ID
PR0544983
PE
3528
FACILITY_ID
FA0005197
FACILITY_NAME
GARYS EXXON SERVICE STATION
STREET_NUMBER
909
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
909 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
774
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I . SITE CONTACTS <br /> v Station Number: Former Exxon RS 7-1050 <br /> Station Address: 909 West Hammer Lane <br /> Stockton, California <br /> Exxon's Project Manager: <br /> Mr. Kevin Hunter <br /> — Exxon Company, U.S.A. <br /> 1200 Smith Street, Room 31123 <br /> Houston, Texas 77002 <br /> 714-656-7755 <br /> '..� Consultant to Exxon: <br /> EA Engineering, Science, and Technology ' <br /> 41 Lafayette Circle <br /> .; <br /> Lafayette, California 94549 <br /> ( 415-283--7077 <br /> EA Project Geologist: Alec Winters i <br /> g . <br /> 2. AC-ii,VIT11 5 MARCA '1 990 THROUGH JUNE 1990' <br /> Groitdxater Sampling 28 '�3une 1990; The five monitoring wells <br /> were gauged, and MW1 , ..:MW2�,.:and. NiW3-:(.Figure 1:). were"A;ampledz. -MW4, <br /> and-MWS Were--dkY1. Samples were submitted under chain of custody <br /> i <br /> t.o (Pace-=Eaborator.ie's, where they were analyzed for total petro- <br /> leum hydrocarbons (TPH) by, DHS-modified EPA Method 8015 and for <br /> the aromatic hydrocarbons benzene, toluene, xylenes, and ethyl- <br /> benzene <br /> thyl benzene (BTXE) by EPA Method 8020. <br /> The. analytical results are summarized in Table 1 (the laboratory <br /> report is provided as Appendix A) Well sampling field forms are ` <br /> included as. Appendix. B. A cumulative history of analytical <br /> dap results,.of groundwater .sampling si:,ce 1986 is <br /> provided in Table <br /> _..... <br /> 2. A site location map is provided as Figure 2.. <br /> 3 PLANNED ACTIVITIES AS OF AUGUST 1990_ <br /> WELL.,INSTALLATION A work plan and permit application have been i <br /> x,AR <br /> filed: with the San Joaquin- Environmental Health Department for <br /> e42/`:1050/sep90/tx. 1 <br /> { <br />
The URL can be used to link to this page
Your browser does not support the video tag.