My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012713
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
909
>
3500 - Local Oversight Program
>
PR0544983
>
ARCHIVED REPORTS_XR0012713
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 9:14:52 AM
Creation date
11/14/2019 4:59:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012713
RECORD_ID
PR0544983
PE
3528
FACILITY_ID
FA0005197
FACILITY_NAME
GARYS EXXON SERVICE STATION
STREET_NUMBER
909
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
909 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
774
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
XMIN WWE�W N-05 AN, <br /> -ANY <br /> 3" tzr ,pY <br /> �'.' - •{ ., - - w sol <br /> TO <br /> 9,Win a <br /> 1, <br /> h <br /> hLe . <br /> L <br /> Exxon Company OSA <br /> t ; 202/225-2745.02 <br /> August 21 , 1987 <br /> SOIL BORINGS <br /> The purpose of the soil borings, which were subsequently <br /> converted to monitoring wells , was to explore the site for the <br /> presence of subsurface hydrocarbons, and to further define the <br /> vertical and areal extent of the contamination previously found <br /> on the site . The borings for monitoring wells 4 and 5 were <br /> located on the southeastern and northern r <br /> - Y property boundaries {see ! <br /> Figure . 2 , Site Plan) to comply with a request from the San. <br /> t Joaquin County Local Health District. Both borings were drilled <br /> = with a truck mounted drill rig using 10 . 5 inch. O.D. (outside <br /> diameter) hollow stem augers . The drilling� g was performed under <br /> a the direction of a Groundwater Technology geologist who also <br /> maintained 'a continuous log of the materials encountered (see <br /> Appendix F , Drill Logs) . <br /> - 2 <br /> SOIL SAMPLES <br /> R ? Soil samples were obtained during drilling using a 2.5-inch <br /> rk <br /> 0 -D . split spoon sampler lined with three 2 inch by 6. inch <br /> brass sample tubes. The sampler was driven eighteen inches ahead -i <br /> . ; of the augers at each sampling point . SampAes were collected at <br /> five foot intervals from . a depth of 5 feet below ground surface <br /> �f � •. to - the .bottom of each. boring. The samples were sealed, capped, <br /> labeled and stored on Ice for transportation to the laboratory <br /> under Chain- of=Custody in accordance with GTI ' s Standard <br /> w� <br /> r <br /> Operating Procedures (SOP ' $ ) 11 . 14, 15 and 19 (see Appendix <br /> ThE}- samples were analyzed for TVH and eTEX using Modified F <br /> t EPA `Met'aod 5030/8020/8015. <br /> F <br /> 6 _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.