My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002123
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
909
>
3500 - Local Oversight Program
>
PR0544983
>
ARCHIVED REPORTS_XR0002123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 8:33:26 AM
Creation date
11/15/2019 8:19:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002123
RECORD_ID
PR0544983
PE
3528
FACILITY_ID
FA0005197
FACILITY_NAME
GARYS EXXON SERVICE STATION
STREET_NUMBER
909
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
909 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Removal of Product-Delivery lines November 5, 1990 <br />' Former Exxon Station No. 7-1050, Stockton, California AGS 30045-1 <br /> since not been used for retail sales The product-delivery lines and dispenser islands were <br /> left in place. The locations of the former tanks, product-delivery lines, and other pertinent <br /> site features are shown on the Generalized Site Pian (Plate P-2). <br /> We understand from personnel of Exxon that they have been conducting a subsurface <br /> environmental investigation at the site since its closure that has included the drilling of soil <br /> borings and installation of monitoring wells <br /> FIELD INVESTIGATION i <br /> f <br /> Site Safety <br /> I <br />' Field work performed by Applied GeoSystems on behalf of Exxon at the project site was <br /> done in accordance with Applied GeoSystems' Site Safety Plan No. 30045-1S (August 20, ' <br />' 1990) This plan describes the basic safety requirements for the subsurface environmental I <br /> investigation related to monitoring the removal of underground product-delivery lines. The <br /> site safety plan is applicable to personnel of Applied GeoSystems and to subcontractors of <br />' Applied GeoSystems. Personnel scheduled to work at the site were briefed on the contents <br /> PP Y � <br />' 3 <br /> �-- Applied GeoSystems <br />
The URL can be used to link to this page
Your browser does not support the video tag.