Laserfiche WebLink
i <br /> IEVArECHXNOLOGIES,INC <br />. 269 Mount Herron Rd <br /> I Suite 101 <br /> Scotts Valley,CA 95066 <br /> (408)438 7511 <br /> FAX(408)438 7515 <br /> 18 July 1990 <br /> iMr. J. Kevin Hunter <br /> Exxon Company, U.S.A. <br /> P.O. Box 4415 <br /> Houston, Texas 77210 <br /> SUBJECT: Work Plan for Vacuum Extraction Soil Remediation <br /> System Installation at Former Exxon Rest Stop <br /> RS 7-1050, 909 West Hammer Lane, Stockton, <br /> California <br /> Dear Mr. Hunter: <br /> In accordance with regulatory agency requirements, the <br /> enclosed work plan for installation of a Vacuum Extraction <br /> Soil Remediation System at the sub3ect site has been <br /> prepared. <br /> The proposed work will be initiated upon acceptance of this <br /> work plan by Exxon Company, U. S.A. and the appropriate <br /> regulatory agencies. <br /> If you have any questions regarding this work plan, please <br /> do not hesitate to call . <br /> Sincerely, <br /> EVAX Technologies, Inc. <br /> jtF <br /> r� <br /> - Pe-f- <br /> Christopher <br /> J. Peoples <br /> Proaect Engineer <br /> Enclosure: <br /> (1) Work Pian for Vacuum Extraction Soil Remediation <br /> System Installation <br /> I <br />