My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002123
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
909
>
3500 - Local Oversight Program
>
PR0544983
>
ARCHIVED REPORTS_XR0002123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 8:33:26 AM
Creation date
11/15/2019 8:19:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002123
RECORD_ID
PR0544983
PE
3528
FACILITY_ID
FA0005197
FACILITY_NAME
GARYS EXXON SERVICE STATION
STREET_NUMBER
909
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
909 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i 'E X <br /> VTECHNOLOGIES,INC <br /> 269 Mount Hermon Rd <br /> Suite 101 -- �E <br /> Scotts Valley CA 95066 RE C rE <br /> (408)438 7511 = t+ <br /> FAX(408)438 7515 <br /> i <br /> OCT 2 9 1990 <br /> 19 October 1990 <br /> Ms Debbie Harris <br /> Exxon Company, U.S.A <br /> P 0 Box 4415 <br /> Houston, Texas 77210-4415 <br /> ISubject. Exxon Station RS #7-1050 <br /> 909 West dammer Lane <br /> Stockton, California <br /> Dear Ms Harris, <br />' The underground construction at the subject site has been completed The <br /> system equipment is scheduled to be installed on 1 November 1990 System <br /> operation will begin after receipt of required permits I have enclosed <br /> the as-built construction drawings and the documentation for the pump <br /> performance test for your records <br /> If you have any questions, please feel free to call <br /> Sincerely, <br /> EVAX Technologies, Inc <br /> !'ILL <br />' Toni Washuta <br /> Project Manager <br />' Enclosure As-built Construction Drawings <br /> Pump Performance Test Documentation <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.