Laserfiche WebLink
i <br /> REMEDIATION CONFIRMATION SAMPLING RESULTS <br /> AND CLOSURE RECOMMENDATION REPORT <br /> (March 1994 Reryiaon) <br /> 909 West Hammer Lane Stocnon California <br /> TABLE OF CONTENTS <br /> 1 0 INTRODUCTION 1 <br /> 2 0 SITE DESCRIPTION 1 <br /> I3 0 BACKGROUND 1 <br /> 4 0 REMEDIATION CONFIRMATION SOIL BORINGS 3 <br />' 4 1 Soil Borings 4 <br /> 4 2 Soil Sample Analytical Results 4 <br /> 5 0 GROUNDWATER MONITORING 5 <br /> 5 1 Groundwater Levels 5 <br /> 5 2 Groundwater Sampling and Analysis 5 <br /> 6 0 CONCLUSIONS 5 <br /> I7 0 REMARKS/SIGNATURES 7 <br /> FIGURES <br /> FIGURE 1 SITE LOCATION MAP <br /> IFIGURE 2 SITE MAP <br /> FIGURE 3 EXCAVATION GRAB SAMPLE LOCATIONS <br /> FEBRUARY 4, 1986 <br />' FIGURE 4 DISTRIBUTION MAP OF TPH-G IN SOIL <br /> JUNE 3, 1993 <br /> FIGURE 5 POTENTIOMETRIC SURFACE MAP <br /> JUNE 21 , 1993 <br /> FIGURE 6 GROUNDWATER ELEVATION HYDROGRAPH <br /> FIGURE 7 DISTRIBUTION MAP OF TPH-G <br /> IAND BENZENE IN GROUNDWATER JUNE 21, 1993 <br /> 93.005C OMR I <br />