Laserfiche WebLink
rt <br /> REMEDIATION CONFIRMATION SAMPLING RESULTS <br /> AND CLOSURE RECOMMENDATION REPORT <br /> (March 1994 Revision) <br /> 909 West Hammer Lane Stockton Caldornia <br /> TABLES <br /> TABLE 1 ANALYTICAL RESULTS SOIL <br /> JUNE 3, 1993 <br /> TABLE 2 WATER LEVEL DATA <br /> TABLE 3 ANALYTICAL RESULTS GROUNDWATER <br /> TABLE 4 SOIL SAMPLES COLLECTED BY GROUNDWATER TECHNOLOGY, INC <br /> 1986, 1987 <br /> TABLE 5 SOIL SAMPLES COLLECTED BY EA ENGINEERING <br /> 1989, 1990 <br /> APPENDICES <br /> APPENDIX A STANDARD OPERATING PROCEDURES <br /> APPENDIX B JUNE 1993 BORING LOGS <br /> APPENDIX C JUNE 1993 LABORATORY ANALYTICAL REPORTS AND <br /> CHAIN-OF-CUSTODY FORMS <br /> SOIL AND GROUNDWATER SAMPLING <br /> APPENDIX D LETTER FROM SAN JOAQUIN COUNTY <br /> APPENDIX E PRODUCT LINE REMOVAL REPORT BY APPLIED GEOSYSTEMS <br /> APPENDIX F DEPTH TO GROUNDWATER AND GRADIENT INFORMATION <br /> APPENDIX G WATER WELL SURVEY <br /> APPENDIX H WELL LOGS AND CONSTRUCTION DETAILS <br /> APPENDIX I SOIL VAPOR SURVEY AND VAPOR EXTRACTION INFORMATION <br /> APPENDIX J AEGIS' SOIL EXCAVATION RESULTS REPORT <br /> AND CASE CLOSURE CHECKLIST <br /> 93OO5c CMR u <br />