My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOLLY
>
3900
>
2900 - Site Mitigation Program
>
PR0505422
>
FIELD DOCUMENTS_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 1:53:50 PM
Creation date
11/15/2019 1:22:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
CASE 2
RECORD_ID
PR0505422
PE
2965
FACILITY_ID
FA0006902
FACILITY_NAME
TRACY WASTEWATER TX PLNT
STREET_NUMBER
3900
STREET_NAME
HOLLY
STREET_TYPE
DR
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3900 HOLLY DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page l of l <br /> Mike Infurna [EH] <br /> From: Toni.Pezzetti@CH2M.com <br /> Sent: Monday, January 14, 2008 2:25 PM <br /> To: Mike Infurna [EH] <br /> Subject: Update <br /> Sorry about the delay in getting back to you. I was on vacation last week. <br /> Here's where we are with Tracy -we did get the 2nd hole (HP-7) in on January 3 -the seal was hydrated at 5:05. <br /> Visible water was observed at 5:15. Weather conditions were worsening, so the cement seal was tremied in <br /> place beginning at about 5:20. For HP-7, well screen was 15-30' bgs, top of sand pack at 12'0", top of fine sand <br /> at 11'6", bentonite chips (hydrated)to 9'6", portland cement to about 6" bgs, with concrete pad and protective <br /> casing. On Friday, January 4, conditions were terrible and no drilling occurred. The crash posts were set for the <br /> two existing wells. We are scheduled to install the 3rd well this Friday. I am meeting the drillers at 8:30. 1 <br /> wouldn't expect to be setting the seal sometime around 11:30. 1 can call you once we start drilling down with the <br /> larger augers to give you a better estimate. Let me know what you'd like. Fortunately, the weather forecast looks <br /> great for Friday. <br /> Thanks. <br /> Toni Pezzetti, PG, CHG <br /> CH2M HILL <br /> Phone (direct)916-286-0297 <br /> Fax(direct)916-614-3497 <br /> tpezzett@ch2m.com <br /> 1/18/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.