Laserfiche WebLink
i <br /> � <br /> Mike Infurna [EH] � b g Page 1 of 1 <br /> From: Toni.Pezzetti@CH2M.com <br /> Sent: Monday, December 31, 2007 2:41 PM <br /> To: amamidi@waterboards.ca.gov <br /> Cc: jdmarshall@waterboards.ca.gov; Mike Infurna [EH]; vijay.kumar@ch2m.com <br /> Subject: Tracy WWTP drilling <br /> Attachments: TracyWorkPlanSmaIIPDF.pdf <br /> Thanks for your help on this. Attached to this e-mail are the work plan submitted to the CVRWQCB and the <br /> response (attached in a separate e-mail) provided to the two issues raised during work plan review. Before he left <br /> on vacation, Jim called me (December 28)and gave me verbal authorization to go ahead with the locations <br /> identified in the work plan. When he and I spoke last week, the planned dates for the well installation were <br /> January 21/22 so not having the letter was not an issue. Because of weather considerations and the drillers' <br /> schedule,we would like to install the wells on January 3/4 (this Thursday and Friday). San Joaquin County EHD <br /> needs confirmation from the CVRWQCB that it has approved the drilling locations (they're okay with e-mail <br /> confirmation). Is it possible for you to provide that confirmation to them (Mike Infurna, copied on this e-mail)? <br /> Thank you very much for your help. <br /> Toni Pezzetti, PG, CHG <br /> CH2M HILL <br /> 2485 Natomas Park Drive Suite 600 <br /> Sacramento CA 95833 <br /> Phone (general)916-920-0300 <br /> Phone (direct)916-286-0297 <br /> Fax(office)916-920-8463 <br /> Fax(direct)916-614-3497 <br /> tpezzett@ch2m.com <br /> 12/31/2007 <br />