My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOLLY
>
3900
>
2900 - Site Mitigation Program
>
PR0505422
>
SITE INFORMATION AND CORRESPONDENCE_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 1:40:39 PM
Creation date
11/15/2019 1:28:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 2
RECORD_ID
PR0505422
PE
2965
FACILITY_ID
FA0006902
FACILITY_NAME
TRACY WASTEWATER TX PLNT
STREET_NUMBER
3900
STREET_NAME
HOLLY
STREET_TYPE
DR
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3900 HOLLY DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORMATION SHEET 2 <br /> ORDER NO. R5-2007-_ <br /> CITY OF TRACY AND LEPRINO FOODS COMPANY <br /> LAND DISCHARGE UNITS OF THE TRACY WASTEWATER TREATMENT PLANT <br /> SAN JOAQUIN COUNTY <br /> it. Facility Description <br /> A. Description of Wastewater and Biosolids Treatment or Controls <br /> 1. The Discharger provides wastewater treatment and disposal services for residences, <br /> businesses, and industries within the Tracy area. The Facility was originally <br /> constructed in 1930 and has experienced three major expansions. The last <br /> expansion was completed in 1987, expanding treatment capacity from 5.5 mgd to <br /> 9.0 mgd. <br /> 2. The Facility consists of a main treatment facility and an industrial facility, and includes <br /> two separate systems for the collection and conveyance of wastewater to the Facility. <br /> The main treatment facility accepts domestic and commercial wastewater via the City <br /> of Tracy's wastewater collection system. The industrial facility accepts industrial food <br /> processing wastewater through a segregated pipeline from Leprino. <br /> The main treatment facility consists of raw influent bar screening, primary <br /> sedimentation, biofiltration, conventional activated sludge, and secondary <br /> sedimentation. Secondary effluent is disinfected by chlorination and dechlorinated <br /> prior to discharge. Biosolids are thickened by dissolved air flotation, anaerobically <br /> digested, and dewatered in unlined sand drying beds. The dried biosolids are hauled <br /> off-site for land application or disposed in a landfill. A flow schematic of the main <br /> treatment facility is shown in Attachment B. <br /> The industrial facility consists of four unlined industrial ponds (approximately 52 <br /> acres), operated by the City of Tracy, and two lined aerated lagoons and one unlined <br /> oxidation pond (8 acres) leased by Leprino from the City of Tracy for preliminary <br /> treatment of its industrial food processing wastewater. Although the aerated lagoons <br /> are lined, the technical specifications for the liner materials are not available, and the <br /> integrity of the liner is not known. Leprino discharges to the unlined industrial ponds <br /> under an industrial pretreatment permit issued by the City of Tracy. <br /> Leprino transports its industrial wastewater to the Facility via a segregated industrial <br /> waste line. Leprino employees operate and maintain the industrial wastewater <br /> pipeline and leased pretreatment units. Leprino's industrial pretreatment program <br /> permit allows for a discharge of up to 850,000 gallons per day of industrial food- <br /> processing wastewater. Compliance with Leprino's industrial pretreatment permit is <br /> measured prior to discharge to Pond 1 (see Figure 1). The unlined industrial ponds <br /> provide evaporation and percolation prior to the wastewater entering the main <br /> treatment facility at the primary sedimentation basins. A flow schematic of the <br /> industrial facilities is shown in Attachment C. <br /> B. Planned Changes <br /> The Discharger is upgrading the Facility to improve treatment and expand capacity. The <br /> treatment system capacity will be expanded to 16 mgd through a four-phase expansion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.