Laserfiche WebLink
ATTACHMENT E <br /> ORDER NO R5-2007- <br /> REQUIREMENTS FOR MONITORING WELL INSTALLATION <br /> WORKPLANS AND MONITORING WELL INSTALLATION REPORTS <br /> Figure F-3 <br /> Unlined Industrial Pond Layout and Groundwater Monitoring Well Location <br /> MW-3 Arrows indicate <br /> To Main Treatment MW-2 direction of <br /> Facility's Primary wastewater Flow. <br /> Clarifiers <br /> Pond 3 Pond 4 <br /> It ac) (14 ac) <br /> Leprino wastewater <br /> after treatment in Pond 2 <br /> aerated lagoons 0 (8 ac) <br /> MW-4 A Pond 5 <br /> A (15 ac) <br /> Leprino industrial pond 1 <br /> pretreatment permit <br /> compliance point for (8 ac) <br /> discharge to City of <br /> Tracy <br /> MW-1 <br /> MW-5 (Background) <br /> (NOT TO SCALE) <br /> Groundwater <br /> Monitoring Well <br /> Location <br />