Laserfiche WebLink
i <br /> CHRONOLOGY <br /> City of Tracy <br /> Wastewater Treatment Plant <br /> 3900 Holly Drive <br /> Tracy, CA 95376 <br /> 01/20/98 One 7,500-gallon underground storage tank used to store diesel fuel for a back- <br /> up generator was removed this date under San Joaquin County Environmental <br /> Health ) <br /> EHD Department permit and inspection. Soil and groundwater samples <br /> P ( <br /> for laboratory analysis were collected from beneath the tank. Analytical results <br /> reported total petroleum hydrocarbons as diesel in the soil and.groundwater. <br /> 06/29/98 Unauthorized Release Report #98-U23 and Notification of Hazardous Waste <br /> Discharge (Prop 65)#98-106 were submitted this date. <br /> 12/05/00 Notice of Responsibility was sent this date to identified Responsible Party (RP) <br /> the City of Tracy. <br /> 02/14/03 A site investigation began with the advancement of four geoprobe soil borings, <br /> SB-1 through SB-4. Soil and groundwater samples were collected for analysis. <br /> See Wright Environmental Services Soil and groundwater Initial Site Assessment <br /> report dated April 7, 2003, available in the EHD site file. <br /> 10/28/08 The siteinvestigation continued with the installation of additional geoprobe soil <br /> borings, SB-5 through SB-9. See Wright's Limited Phase I Investigation dated <br /> January 14, 2009. <br /> 10/16/09 The site investigation continued with the installation of one groundwater <br /> monitoring well, MW-1, located near SB-5. The report of the work is due no later <br /> than December 15, 2009. <br /> 03/03/10 EHD letter sent this date directing submittal of the overdue report of findings from <br /> the groundwater monitoring well installation. <br /> 04/16/10 Wright's Groundwater Monitoring Well Installation and Initial Groundwater <br /> Sampling and Chemical Analysis, 3'd Quarter 2009 report submitted this date to <br /> Geotracker, (although the report is dated February 16, 2010). <br /> 09/20/10 Wright's Waste Water Treatment Plant Quarter 3, 2090 Groundwater Monitoring <br /> Report was submitted to Geotracker this date. <br /> 11/18/10 Wright submitted Closure Summary Report to Geotracker this date. <br />